Repository logo

Theses and Dissertations

Permanent uri for this collection, recent submissions.

Thumbnail Image

  • 1 (current)
  • Reference Manager
  • Simple TEXT file

People also looked at

Specialty grand challenge article, grand challenges in construction management.

construction management thesis sample

  • Department of Architecture, Faculty of Engineering, University of Strathclyde, Glasgow, United Kingdom

This article is written for the launch of the specialty section on construction management at the Frontiers in Built Environment. This new specialty section opens an on-line platform for academics and practitioners in the subject field to share valuable experiences and findings from innovative research and development as well as practices, which focus on the management of people/workforce, product/production, and processes across built environment project stages, including development and construction, operation and maintenance, as well as demolition and redevelopment, under considerations on the dependability and productivity of construction management services. In this article, the writer presents his humble opinions limited from experiences from academic research and professional services around the world in the past three decades. The topics derived on grand challenges in construction management are gigantic in terms of their coverages, but may have huge impacts on professional development in both short and longer term. Discussions presented here on grand challenges in construction management consist of four parts to respectively focus on an initial cognitive framework of the construction management body of knowledge (CMBOK), intelligence pervasive construction management systems, interdisciplinary digital innovation, and solutions for performance enhancement in megaproject delivery. The research methodology that support the writer to describe the four grand challenges includes literature review, comparison study, site observation, and system architecture analysis and development. It was the writer's initial abductive reasoning to identify the four grand challenges in construction management through an extensive literature review, which was based on national and regional strategies for the construction industry from the world top economies. Some key references relating to these four major topics are collected to support discussions in this article. It is expected that this article could contribute to the debate as well as research and development in construction management in terms of continuous technical enhancements on project-oriented performance and value regardless the scope, the location, and the time associated and concerned. As the study was conducted through abductive reasoning, this article should have its limitation on the coverage to all grand challenges in construction management, and this should leave many unanswered questions for further exploratory research.

Introduction

Construction management (CM) is an important field of management practice oriented research into related issues at both the macro and micro sphere across the entire life cycle ( CIOB, 2010 ) of the built environment. The macro sphere of CM can generally cover all management related issues on the built environment across its life-cycle stages; for example, the industry wide statistics, analysis and projections on codes and standards, building information management, procurement and contracts, supply network, workforce productivity, and workplace health and safety, etc. at national, regional and/or international level. The micro sphere of CM, on the other hand, covers specific issues relating to project delivery at various work stages; for example, project specific study on feasibility, cost plan, design justification, process schedule, risk assessment, quality and traceability assurance, productivity analysis, post occupancy evaluation, and service level agreements, etc. The cross-stage process of CM makes it possible to conduct inter-connected professional services for clients to have maximum value from investment.

Since the principles of scientific management was put forward by Taylor (1911) , the theory has profound influence to the evolving theory of management science in over 10 decades, and there has been a significant theoretical evolution in the management world. As summarized by Jones and George (2016) , the evolution of management theories in the past century has demonstrated a trans-disciplinary development across five fundamental theories, including the scientific management theory, the administrative management theory, the behavioral management theory, the management science theory, and the organizational environment theory. This theoretical evolution in management science has eventually formed an entire body of knowledge (BOK) for management practice in various professional fields across industry sectors, and consequently it has continuously provided strong theoretical support to CM oriented research and practice.

The purpose of this article is to describe a recent research undertaken by the author to identify grand challenges in construction management in response to present national/regional strategies for the construction industry in world top economies, and to inform decision making on further research and development as well as learning and training with regard to the enhancement of dependability and productivity in construction management services. In order to justify the need for this research, the author has looked into the gigantic accumulation of related resources as collected in not only civil engineering databases at ASCE (2019) and ICE (2019) but also multidisciplinary databases on the Web of Science platform ( Clarivate, 2019 ), and the search term used is “challenges AND construction management.” It has been found that there is limited number of publications related to this topic, and it looks there is currently no publication dedicating to a discussion on grand challenges in CM focused research and development. From this point of view, this article has the opportunity to fill the gap in research into construction management.

This article is based on the author's observations through academic research and professional services in related areas around the world over the past three decades. Based on a further review on grand challenges and strategic priorities for the construction sector in six world's major economies, including United States, China, Japan, Germany, United Kingdom, and European Union, four grand challenges that reflect national/regional strategic priorities were eventually derived as significant ones. Table 1 is used to clarify the reflection of four perceived grand challenges in construction management to existing strategic proprieties in these world's major economies. It's the author's opinion that these four grand challenges are responsive to those national/regional strategies and therefore could be useful with further discussions to inform further research and development in construction management with regard to the pursuit of national/international leadership in this subject field.

www.frontiersin.org

Table 1 . Four topics on grand challenges in construction management.

According to this simplified independent response to the national/regional strategic priorities for the construction sector in the six world's major economies, this article aims to provide further discussions on the four grand challenges, and focuses on Frontiers of Research and Development in Construction Management with regard to the increasing need for service dependability and productivity in the development and operation of the built environment in both short and a relative longer term. This article therefore covers four topics on the four grand challenges in relation to three identified managerial domains on people/workforce, product/production, and processes, respectively, in the provision of CM services.

In developing the contents of this article, the four grand challenges are used for its structure to cover the following specific discussions:

• The grand challenge on the development and use of a theoretical CMBOK framework and its contents in accordance with research and practice accumulated across disciplines over long term in the past,

• Two grand challenges, in response to the needs for intelligent management systems and interdisciplinary digital innovations respectively, in order to improve the performance of constructions management services, and

• The grand challenge on technical enhancement for construction management in megaproject delivery in order to promote best practices through large-scale construction management services.

The relevance of these topics to the three management domains derived from an extensive review on five main management theories (see Figure 1 ) is further described in Table 1 . This qualitative analysis helped the author to make decision on topics to discuss grand challenges in construction management.

www.frontiersin.org

Figure 1 . Management domains of CMBOK interconnected with management theories.

This article is based on the author' recent research through the use of two methods, including extensive literature review and qualitative comparison study, while his long-term experiences and observations in academic research and professional practices were also incorporated. In addition, this article has been thoroughly improved according to a huge amount of insightful comments given by reviewers.

In this article, the author uses terms, including the dependability of construction management services and the dependable built environment, to incorporate the need for dependability ( Chen, 2017 ) at life-cycle stages of the built environment. According to the only three results from searching on Google as of 3 November 2018, the term dependable built environment was also used in practice by the Stonepay Construction in Canada. For the built environment, dependability ( BSI, 2014 ) can be regarded as a collective term for time-related quality characteristics with regard to the ability to perform as and when required throughout the life cycle of either a product or a service. It is the author's assumption that the incorporation of dependability with the technical term of built environment on the product side and construction management on the service side can facilitate an integrated measure that can cover engineering and management aspects connecting to dependability characteristics, which can include adaptability, availability, construability, durability, maintainability, recoverability, reliability, health and safety, security, supportability, and sustainability, etc. It is the author's opinion that the use of dependability for both built environment as the product and its life-cycle oriented services can effectively integrate various interconnected considerations and decision making on people/workforce, products/production, and processes in construction management for quantified quality assurance across its whole life cycle oriented services in the built environment. While numerous cases have shown that a lack of dependability may have significantly adverse impact through rewordings on productivity, it is important to give priority to dependability in the pursuit of productivity in construction management.

It is the author's expectation for this article to be useful for not only colleagues working on innovative research and development in the subject field of construction management, but also the specialty section on construction management at the Frontiers in Built Environment to be part of long-term leadership development in research and development for the construction management profession across the world. As the four described grand challenges were derived in response to current national/regional strategies for the construction sector in major economies, further research and development under the four grand challenges are also expected in order to timely and effectively support technical enhancements on both dependability and productivity in construction management services for the sustainable built environment.

Construction Management Body of Knowledge (CMBOK)

The first grand challenge to discuss is to establish a CMBOK, which can be useful for construction management oriented learning, practice, research and development in terms of both dependable professional services and continuous technical enhancements. Generally speaking, construction management is an elemental subject of the built environment discipline, and it is an essential professional service interactively connecting with other specific professions working inside the construction industry. It has extensive connections to other subject fields such as planning, design, and operation ( CIOB, 2010 ) within the built environment sector, in addition to resources and manufacturing, computing and programming, transportation and supply management, legislations and governances from other adjunct sectors to support its work procedure at various stages. For professional construction management services, there are mature work procedures such as the definitive UK model Plan of Work ( RIBA, 2013 ), the code of practice such as the CIOB (2014) Code of Practice for Project Management for Construction and Development, and regulations such as the Construction (Design and Management) Regulations 2015 ( HSE, 2015 ) in the United Kingdom. Construction management is therefore a dedicated profession that provides services focusing on construction to satisfy both project-wide and industry-wide needs for professional management within the built environment.

Management Domains

The BOK for a specific subject field is generally essential and useful for both practice toward excellence and research for innovation. As a good example, the body of knowledge for project management (PMBOK) ( PMI, 2017 ) has demonstrated the value of BOK in project management across industry sectors over the past two decades. It was originally published and continuously updated at the Project Management Institute ( PMI, 2017 ) to guide practice in project management, and eventually adopted by the International Organization for Standardization ( ISO, 2012 ) as an international standard for project management. In addition to professional guidance for general project management, PMI (2016) has continuously provided the extension to the PMBOK ® Guide for construction management since 2003, and this provides useful reference to form the CMBOK. The author would like to determine CMBOK as a set of structured descriptions about professional knowledge and underpinned techniques to sustain dependable quality services of construction management at both macro and micro scale in the built environment.

In connection with the evolution of theories and technologies in engineering and management, the technical scope of construction management has been enlarged, and the delivered service focuses on enhanced dependence and efficiency across life-cycle work stages ( CIOB, 2010 ). It is a matter of fact that an enormous amount of endeavors made by academics and practitioners in construction management worldwide is a huge contribution to form the CMBOK, although there is currently not a definitive framework, such as the PMBOK ( PMI, 2016 , 2017 ) and the Civil Engineering Body of Knowledge (CEBOK) ( ASCE, 2008 , 2019 ), for construction management in both project-wide and industry-wide scale. It is therefore a big task for further research into the cognitive framework of CMBOK and its elements and contents with regard to three identified cognitive domains, including people, products and processes (See Figure 1 ), to foster innovations in a more effective way for not only the dependence and efficiency of this professional service in practice, but also quality higher education ( Pellicer et al., 2013 ) and continuing professional development (CPD) ( Chen et al., 2006b ) for professionals and students, respectively.

For the three technical domains mentioned above on people/workforce, products/production, and processes in construction management, Figure 1 is used to clarify its origin by illustrating the connections between management theories ( Jones and George, 2016 ) to three identified main management domains that can be used to structure the construction management body of knowledge (CMBOK). It summarizes five representative toolkits derived from management theories that can support construction management on three managerial domains, which cover people/workforce, products/production, and processes. These managerial domains are identified through an extensive review into the five management theories with regard to fundamental issues that they are dealing with. As described by Oakland and Marosszeky (2017) and Kajima (2018) based on need for best practices, these domains are essential for total construction management (TCM) that enables a comprehensive use of all contemporary management theories to tackle issues on workforce, production, and processes across project life cycle in the built environment. In theory, TCM can be used as a term for the provision of all types of specific construction management services together under one contract, in comparison with construction management that refers to professional services in a generic term.

It is profoundly meaningful for the CM profession to have a cognitive framework of the body of professional knowledge, like the one ASCE and PMI have been working on for continuous professional development and further research. There are several critical reasons to justify its importance with regard to its value for different stakeholders involved in construction management. For stakeholders such as construction contractors, it could be a useful guide to take the initiative under the blue ocean strategy ( Kim and Mauborgne, 2004 ), which is defined as the simultaneous pursuit of differentiation and low cost to open up a new market space and create new demand, to develop outstanding expertise above horizontal competition. In other words, a bespoke BOK can ensure a sound development of expertise in providing professional services in one or more specific areas within an entire knowledge map. For clients who invest in the construction project, it is a useful benchmark for them to evaluate the performance of construction management at various project stages. In addition to its value for construction management practice, the cognitive framework of construction management body of knowledge can also be useful to inform higher education ( Arditi and Polat, 2010 ; Nguyen et al., 2017 ), professional training, as well as academic and professional research in terms of well-scoped depth and long-term continuous professional development. It is therefore considerate to develop a cognitive framework of BOK for the construction management profession.

Cognitive Domains

The structure of CMBOK, as one particular focus of this article to promote an initiative development for the whole construction management profession, can be outlined by using related cognitive domains, also called knowledge areas or domains, as structural elements of professional knowledge for the framework. For the structure of CMBOK, it therefore becomes critical to define its cognitive domains and their contents in order to establish such a framework of professional knowledge.

The definition of cognitive domains relies on a comprehensive coverage to both explicit and tacit knowledge ( Dalkir, 2017 ), which is required for quality services in specific professional areas such as civil engineering, construction management, and project management, respectively. One particular effort to identify all cognitive domains relating to construction management is to review possible ones adopted in existing BOKs such as CEBOK ( ASCE, 2008 , 2019 ) and PMBOK ( PMI, 2016 , 2017 ) and to make holistically consolidated connections to construction management profession. In the meantime, the review needs to incorporate a thorough consideration on work procedure such as the Plan of Work ( RIBA, 2013 ) with regard to interconnections among identified cognitive domains; moreover it is always necessary to incorporate learning from the best practice in CM. At the initial stage of CMBOK development, as described here, a technical review into the two existing BOKs was conducted through a comprehensive comparison between them and this comparison study can help to develop the CMBOK framework at initial stage.

The sources of knowledge are critical for the establishment and justification of a dependable cognitive framework of professional knowledge. Two reference knowledge frameworks including CEBOK ( ASCE, 2008 , 2019 ) and PMBOK for construction management ( PMI, 2016 ) are recommended for both the structure and contents development of CMBOK. Through the author's initial study on an outline structure of CMBOK, a preliminary framework of 18 cognitive domains under 3 management domains is put forward in Table 2 . This preliminary main structure was developed in comparison with the two highly relevant cognitive frameworks, i.e., CEBOK and PMBOK for CM, respectively, and through evidence based learning from various sources, including:

• Standard industrial classifications such as the UK Standard Industrial Classification of Economic Activities ( ONS, 2009 ),

• Databases run by both professional bodies, including the ASCE Civil Engineering Database and the ICE Virtual Library, and professional publishers, including Elsevier, Emerald, McGraw-Hill, Sage, Springer, Taylor & Francis, and Wiley, etc.,

• Books published in construction management by world-renowned scholars,

• Professional reports by top construction management organizations such as high-ranked main construction contractors ( EMAP, 2017 , 2018 ; ENR, 2018 ),

• Degree programmes accredited by professional bodies such as the American Council for Construction Education ( ACCE, 2017 ), the Chartered Institute of Building ( CIOB, 2018a ), and the Royal Institution of Chartered Surveyors ( RICS, 2018 ), and

• The author's extensive observations on site and online in relation to construction management for numerous projects worldwide.

www.frontiersin.org

Table 2 . Cognitive domains of professional BOK.

The 18 cognitive domains proposed as the preliminary main structure of CMBOK (see Table 2 ) are divided into three categories in terms of management domains, including People/Workforce, Product/Production, and Processes, which are consistent with the three generic management domains identified through the author's extensive review on five main management theories (see Figure 1 ). The incorporation of the three management domains into structuring CMBOK here is based on the following considerations:

• CM practices are well-guided and supported by generic management theories,

• The development of CM theories is based on both management science and professional practices,

• The three management domains can provide an extensive coverage to CMBOK related issues in not only professional practices, but also education, training, research and development, and

• The need for and potentials of further research and development to sustain dependable CM services for the sustainable built environment.

Details about how the preliminary main structure of CMBOK (see Table 2 ) was defined under these four considerations are describe below in response to the three management domains.

For the management domain on People/Workforce in the case of construction management, four cognitive domains are proposed here for the CMBOK framework, and these include the management of Enterprises in relation to construction organizations, the management of Knowledge to support construction practices, the management of Stakeholders involved in various construction operations, and the management of Workforce to undertake construction activities at both project and non-project scale. The choice and definitions of People/Workforce related cognitive domains for CMBOK are essentials for developing its technical details relating to the constitution and competence of workforce working on either building or infrastructure project at various stages where construction management services are in need.

For the management domain on Product/Production in the case of construction management, seven cognitive domains are proposed here for the CMBOK framework, and these cover the management of construction project at various work stages across the whole life to cover the management of Cost across project life cycle; the management of Design upon interconnected technical outcomes across three stages covering concept design, developed design, and technical design; the management of Engineering solutions during construction, maintenance, repair, refurbishment, decommissioning and demolition; the management of Facilities in terms of relevant professional services at operation stage; the management of Plant at both construction and operation stage, the management of Quality of built assets in construction, maintenance, repair, refurbishment; the management of the use of Resources in relation to key considerations on quality, quantity, and embodied energy, etc. The choice and definitions of Product/Production related cognitive domains for CMBOK are essentials for developing its technical details relating to the physical products and production of buildings and infrastructures that construction management profession can support.

For the management domain of Processes in the case of construction management, seven cognitive domains are proposed for the CMBOK framework cover the management of Communications, the management of Supply network, the use of Management systems for various purposes on either individual issues such as environment, health, quality, safety, and welfare, or all tasks of the entire project; the management of Procurement through sound procedure and effective contract control; the management of Risk and Time at various work stages and scopes across project life cycle; and the management of Changes and Emergency whenever unexpected issues may occur in the whole project life. The choice and definitions of Processes related cognitive domains for CMBOK are essential for developing its technical details relating to a whole range of processes of making the built environment built through construction management services.

In addition to the main structure of CMBOK framework, there is another aspect constituting the entire challenge of developing CEBOK, for which the substructure of the main knowledge framework under the 18 cognitive domains described above needs to be defined. It is the author's consideration that the definition of the substructure system also relies on all knowledge sources identified for the proposed preliminary main structure of CMBOK.

A further review into three key sources of information was conducted to detect whether the 18 cognitive domains proposed as the preliminary main structure of CMBOK could be recognized at a satisfactory level. Table 3 presents a comparison from this review, in support of three sets of key references selected from CIOB, British Standards Institution (BSI), and ISO, respectively.

www.frontiersin.org

Table 3 . Recognition of cognitive domains proposed for CMBOK.

The three sets of key references (see Table 3 ) selected for this comparison study include:

• CIOB (2014) Code of practice for project management for construction and development, in harness with several other related publications including the Design Manager's Handbook ( Eynon, 2013 ), CIOB (2015) Time and Cost Management Contract suite, CIOB (2018b) report on Improving Quality in the Built Environment, CIOB (2018c) Guide to Good Practice in the Management of Time in Major Projects, and CIOB (2018d) course on Accident Investigation and Root Cause Analysis.

• BSI (2006) Guide to project management in the construction industry, and

• ISO (2017a) standards for construction, in harness with several other related ISO standards with regard to improving the performance of construction management services, for which relevant issues on quality, productivity, and sustainability, etc. ( Bernold and AbouRizk, 2010 ) need to be dealt with.

It looks from this comparison study that all 18 cognitive domains proposed to structure the CMBOK are well-covered by three sets of key references in terms of various issues in construction management practice. This coverage indicates a good justification associated with the preliminary main structure of CMBOK proposed here. Therefore, the CMBOK framework proposed in Table 2 is recommended for further use to fulfill the gap on the shortage of such a BOK currently available for construction management at various scales in terms of practices, education and training, and research and development.

For CEBOB, in addition to its structure system, it is a continued process supported by professionals to add contents into this structured knowledge system. The contents of CEBOK under an established knowledge structure are gigantic in terms of the amount of knowledge accumulated from long-term practice and research in construction management across industry sectors worldwide. From this point of view, it is ideal to have an international organization to lead the development and maintenance of CMBOK, which can be widely recognized and used for construction management.

Intelligent Construction Management System

The second grand challenge to discuss is the establishment and utilization of intelligence pervasive construction management systems to thoroughly support project-based practices at workplaces across work stages. From the author's point of view, an intelligence pervasive management system is a computer aided management system that incorporates the use of experts' knowledge and artificial intelligence (AI) based on the collection and process of relevant data and information from the real world. With regard to the importance of Industry 4.0, the construction industry is now under rapid transformations to adopt digital technologies that enable innovations in products and processes across the supply chain network, and it has become inevitable to incorporate new concepts driven by digital technologies into traditional management systems such as management information system (MIS) and enterprise management system (EMS) for construction management.

It has been always an inspiring learning experience for the author to look into progresses on research and development in the theory and solutions of AI since he put forward the concept of intelligent methods for construction engineering and management ( Chen and Xu, 1996 ; Xu and Chen, 1997 ). In connection with the fast development of information and communication technologies (ICT) since 1990s, recent research and development in applied AI solutions for enhanced practice in construction management has shown insightful perspectives and effective progressions. For example:

• The use of artificial neural network (ANN) ( Waziri et al., 2017 ) across various predication related issues in construction management,

• The use of knowledge sustained analytic network process (ANP) ( Chen, 2007 ) to evaluate options for informed decision making in construction management, and

• The integration with automation technology to deploy single-task and multi-task robots ( Skibniewski, 1988 ; Castro-Lacouture et al., 2007 ; Bock and Linner, 2016 ; Black and Pettitt, 2018 ) in construction projects.

It has been further emphasized by Blanco et al. (2018) recently regarding the adoption of applied AI in construction management in terms of project planning optimization, constructability justification, materials and inventory management, and risk and safety management; and these applications all demand a systems-based approach ( Briesemeister, 2018 ) to improve the quality and productivity of construction management. It looks that an integrative use of data, information and knowledge (DIK) ( Allee, 1997 ; Walker, 2016 ) is now just in front of the construction management profession, while the DIK set can be collected from either construction projects or construction professionals in dealing with specific issues such as those listed in Table 2 in a more accurate and efficient manner.

In response to the increasing need for comprehensive use for DIK in construction management, a new concept about intelligent construction management system (iCMS) is described below in terms of its concept, purpose and value, conceptual model, and two tier systems. Hopefully this description could be useful for further considerations, discussions, and research and development in this area.

An iCMS is a construction management system aided by AI techniques that can trigger human/rational learning, thinking and acting ( Russell and Norvig, 2010 ) in connection to integrated DIK clusters and their elemental sets (see Table 4 ), which are specifically structured on a spectrum of expected helpfulness to assist the use of human intelligence at an enhanced consistent level in CM practice.

www.frontiersin.org

Table 4 . DIK clusters and their elemental sets for CM.

The entire DIK set need to be carefully collected with continuous updating manually and/or automatically from various sources under the CMBOK framework, and this ensures the system performs effective practical support connecting with experts' wisdom, which can be derived from computing processes at different scopes covering project/programme level, enterprise/group level, and local/regional level, etc. in a high efficient manner toward excellent professional performance. The iCMS needs to be well-connected with DIK sources covering the management team and a range of databases and knowledge bases to ensure dependable support to construction management practice.

Purpose and Value

The purpose of incorporating an iCMS in practice is to equip the project-oriented management team with dependable technical toolkits for better CM service delivery. The iCMS toolkit aims to facilitate the integrative use of not only expertise and knowledge accumulated from the past practice, but also data and information collected from the on-going project in real time. From the best practice point of view, specific DIK sets are required to deal with critical problems relating to the management of people/workforce, product/production, and processes across project stages.

The value of iCMS for construction management practice is its function to precisely perform calculated decision making support through the effective and efficient use of DIK. This calculation can be made through co-computing processes over a gigantic body of chaotic interactions among workforce, production, and processes within the dynamic project environment across work stages. Therefore, the iCMS is to provide a systematic approach to better using DIK that quantify chaotic interactions in construction projects. In terms of the need for continuous excellent performance across construction management teams, the iCMS is to run through computing systems as an essential smart assistant.

Conceptual Model

A conceptual model of iCMS is illustrated in Figure 2 . The intelligence expected from such a system for construction management can be achieved in its capacity on the integrative use of relevant DIK through a formal work procedure based on individual management systems such as environmental management system ( Chen and Li, 2006 ), health and safety management system ( Griffith, 2010 ), knowledge management system ( Anumba et al., 2005 ), quality management system ( Thorpe and Sumner, 2004 ; Rumane, 2018 ), and project management system ( Chen, 2018 ), etc., which can be dynamically connected inside individual project-oriented computer systems in connections with building information models (BIM) for continued accurate inputs and useful outcomes.

www.frontiersin.org

Figure 2 . A conceptual model of iCMS.

This conceptual model illustrated in Figure 2 consists of four functional entities that are connected through DIK and/or supporting procedures, and these entities include CMBOK, CM practices, intelligent CM systems, and AI technologies and other digital technologies.

A two-way connection between entity CMBOK and entity CM Practices is set up to describe their relationship, which covers the two aspects, including:

• CMBOK as a collection of well-structured professional knowledge is to accumulate relevant DIK from CM practices, and the inputs under a given CMBOK structure are collected from CM practices, which covers all individual practices on construction management; and

• CMBOK would influence/support CM practices at various scales through purpose driven application/reuse and/or continuous learning/training based on its classified collections.

For the entity of intelligent CM systems, it has two sub-entities forming an entire tier system, which is described in the next section. This entity is integrated with three other entities in the following ways:

• CMBOK provides the structure and contents of DIK for individual intelligent CM systems,

• CM Practices can be assisted/supported through the use of individual intelligent CM systems, and

• AI technologies and other digital technologies are adopted to support individual intelligent CM systems with expected functions.

It is anticipated that this conceptual model can be useful to clarify the concept of iCMS and its research and development toward intelligent construction management.

Tier Systems

Exploratory research facing grand challenge on intelligence systems for construction management can be conducted through two stages, including the initial stage on sub-systems, i.e., individual management systems, and the secondary stage on an entire iCMS system, i.e., an integration of all its elemental sub-systems. They are called Tier 1 systems and Tier 2 systems, respectively, here based on different functions that individual systems can provide. Generally speaking, Tier 1 systems are sub-sets of Tier 2 systems. The research and development of the two types of systems highly rely on thorough system analysis and design, reliable inputs, and effective use of DIK within the system to support usages in construction management upon various issues and situations. A brief description about the two types of systems is given below for discussion toward further actions in research and development.

Tier 1 systems: Individual intelligent management systems. These systems are designed, developed and implemented for construction management in specific areas as listed in Table 2 . For example, the system for purposes on managing people/workforce, product/production, and processes, respectively, could be:

• An intelligent EMS for managing people/workforce involved in construction projects or project enterprise at various levels in an organization of either clients' or contractors',

• An intelligent cost/quality management system for managing product/production targeted by either an organization of clients' through the investment into their capital projects, or an organization of contractors' through the delivery of entrusted construction projects, and

• An intelligent information and communication management system for managing processes deployed within an organizational environment of construction projects on either clients' or contractors' side.

The intelligent functionality and capability of these individual management systems need to be casted by incorporating a number of interconnected inputs on DIK under the CMBOK framework. There have been initiatives in research and development in Tier 1 systems. For example, Grahovac and Devedzic (2010) presented an expert system to support decision making in cost management; although it was not for construction cost management, their experiment has indicated a promising application of intelligent cost management system in construction, and such an application can be hybrid by incorporating the use of other relevant techniques such as the research that Chou et al. (2015) have conducted by interactively using Genetic Algorithm (GA), ANN, and Case-based Reasoning (CBR) to predict project award price, and this hybrid use of intelligent methods can be further integrated with BIM ( Allplan, 2018 ) for intelligent cost management at various project stages. By learning lessons from other sectors, such as the healthcare sector where it was found that an intelligent cost management system, for example, can leverage relevant data to swiftly identify opportunities so as to achieve savings of $10 per member per month (PMPM) with a conservative calculation ( MedSolutions, 2013 ), it can be anticipated with a positive sensation that the adoption of individual intelligent management systems in construction can significantly improve construction management on various aspects.

According to the concept of iCMS, the use of well-developed practical solutions of AI is essential for Tier 1 systems. In addition to the example given above, it is obvious through literature review that initiatives in research and development in Tier 1 systems have widely developed through the use of AI techniques in natural language processing, knowledge representation, automated reasoning, machine learning, computer vision, and robotics ( Russell and Norvig, 2010 ) for construction management. The following are good examples for Tier 1 systems:

• A natural language processing system to extract precursors and outcomes from unstructured injury reports ( Tixier et al., 2016 ),

• A knowledge extraction and representation system for narrative analysis in the construction industry ( Yeung et al., 2014 ),

• An expert system for crack diagnosis in cast-in-place reinforced concrete structures ( Chen et al., 1999 ),

• A construction noise prediction model based on case-based reasoning in the preconstruction phase ( Kwon et al., 2017 ),

• A machine-learning model for estimating construction costs ( Rafiei and Adeli, 2018 ),

• A computer vision-based workforce activity assessment in construction ( Luo et al., 2018 ),

• A robotic approach to construction waste recycling ( Wang et al., 2019 ).

The adoptions of individual AI techniques in these exploratory research and development have demonstrated the effectiveness of Tier 1 systems to support construction management, and these systems also shows potentials for integration to form a more powerful iCMS toward Tier 2 systems.

Tier 2 systems: Integrated intelligent management system. In principle, an integration of several individual Tier 1 systems can be further developed by using groupware (collaborative software) technology to form collaboration systems ( Nunamaker et al., 2014 ), and this integration is expected to enable more functional intelligent construction management system. From a conceptual point of view, the integration of selected Tier 1 systems can yield one Tier 2 system that can support construction management activities in a transdisciplinary way in multiple functional areas covered by Tier 1 systems, respectively. There are different levels of system integrations, for example, it can be either an integration of several individual Tier 1 systems for project-specific intelligent management based on individual contracts with clients, or the integration of all individual types of Tier 1 systems to form all-round intelligent management for general use by main contractors. In other words, for a bespoke iCMS, the scope of system integration may reflect the scope of construction management contract for which the system is expected to work for in specific projects. On the other hand, there is another type of Tier 2 systems, for example, the i-Construction system ( STI, 2017b ), which is developed as an entire system with sub-systems to perform designed functions for generic use to support CM activities across all types of projects. In comparison with groupware integration that satisfy specific needs for construction management at suitable workplaces in the project environment, the new development of an entire intelligent system faces more challenges in terms of the incorporation of complex sub-systems and human intelligence with thorough connections to CMBOK and DIK in a general way to make enable all necessary functions for construction management.

There are specific issues to be dealt with in the research and development for iCMS. For example, it is essential to not only sufficiently describe DIK and sources for collection, but also accurately collect and effectively use them in order to make the system useful. By learning lessons from construction management practice in relation to the use of computer systems such as a BIM system, for which a comprehensive collection of relevant data and information from construction stage may not be typically well-functioned inside the system and consequently leave data gaps less filled across design, construction and operation stage. Therefore, a set of essential questions and answers under systematic considerations connecting to multiple disciplines within construction projects may help system design, development and usage.

Digital Innovations

The third grand challenge to discuss is the digital innovation throughout its project-oriented work procedure. The need for and demand on innovative reengineering ( Love and Li, 1998 ) in construction management has progressively emerged and increased through the requirement and provision of dependable management services in the construction sector. In the meantime, the availability of advanced technical solutions in sciences and technologies has greatly supported (with huge potentials) the technical enhancement of construction management by incorporating interdisciplinary digital innovations. The discussion here focuses on adopting advanced technologies in relation to the theories and solutions of informatics and automation for further development in construction management.

Construction Informatics

Construction informatics is the interdisciplinary science of the application of advanced computing and ICT to construction engineering and management. The adoption of technical solutions based on ICT driven research and development has been significantly increasing in construction management over the past several decades. For example, technologies such as artificial intelligence (AI), artificial reality (AR), which is the author's term to cover virtual reality (VR), augmented reality (AR), mixed reality (MR), BIM; geographic information systems (GIS), global positioning system (GPS), management information system (MIS), and process simulation (PS) etc. have all been applied in research and development for practice enhancement in management on people/workforce, products/production and processes in building and infrastructure projects. Table 5 makes a summary of exemplar research and development initiatives focused on adopting various digital innovations for construction management through research and development. These initiatives were identified from not only relevant strategies and practices by top international construction contractors, including Balfour Beatty, Bechtel, Kajima, Laing O'Rourke, and Skanska, but also some representative academic research published in China, European Union, UK, and USA.

www.frontiersin.org

Table 5 . Exemplar R&D initiatives on construction informatics.

These technical innovations have demonstrated anticipated results such as significantly improved work efficiency via multidisciplinary construction information management although there are still potentials for further research and development in terms of system functionality and interoperability. On the other hand, it is also necessary for interdisciplinary digital innovation to incorporate useful ideas from various professions relating to project management. For example, it is an unresolved question regarding how the incorporation of economics, psychology and sociology ( Harty, 2005 ; Winch, 2009 ; Mascia, 2012 ; Walker, 2015 ) focusing on the performance of individuals and project team into ICT systems for construction management can make further technical enhancement. Further interdisciplinary digital innovations through the use of theory and techniques in construction informatics may therefore need to consider both tangible and intangible aspects within project environment and related scenarios.

From a research and development point of view, there are a number of areas in interdisciplinary digital innovation for enhanced practice and learning in construction management, and these areas can be connected to the three identified domains (see Figure 1 ) of construction management with regard to innovations in:

• People/Workforce management. For example, DIK collection, analysis, and integrative usage,

• Product/Production management. For example, Performance (on Cost, Quality, and Schedule, etc.) modeling, monitoring and assessment, and

• Processes management. For example, Process (for Construction Engineering and Management) reengineering design and coordinated implementation.

In the area of applied AI with regard to the need for alternative research approaches ( AlSehaimi et al., 2013 ) as well as the provision of useful technical solutions, the deep learning technology has indicated a promising future for adoption in order to improve the productivity of construction management professionals, and the technical enhancement needs to be pursued toward accuracies in management in terms of interconnected working efficiency within networked teams to effectively tackle persistent problems relating to major issues on cost, quality and time in project delivery.

Construction Automation

Construction automation is regarded as the use of automatic equipment or machines in construction. The automation technology has been increasingly studied and adopted in the construction sector ( Bock, 2015 ; Chen et al., 2018a ; Hawksworth et al., 2018 ) to improve not only the quality of products but also the efficiency of processes as well as resources use. For construction management, new industrialized construction engineering solutions have been introduced to practices, and these include:

• Design for Manufacturing and Assembly (DfMA) ( BCA, 2016 ),

• Design for deconstruction/disassembly (DfD) ( Rios et al., 2015 ),

• Digital production systems such as 3D printing ( Bechtel, 2018 ; De Laubier et al., 2018 ; García de Soto et al., 2018 ; Skanska, 2018 ),

• Digital data collection and construction verification systems such as drones ( Skanska, 2018 ), and 3D scanning ( Faro, 2019 ),

• Autonomous construction equipment ( Black and Pettitt, 2018 ) and vehicles ( Bechtel, 2018 ), and

• Construction site automation ( Kajima, 2018 ).

These industry led initiatives have shown progressive achievements and new opportunities for lean construction ( Alarcón, 1997 ) toward a wide range of technical enhancements at interdisciplinary scale that integrates construction engineering and construction management across the supply network. For both research and practice to be well-prepared for this disruptive innovation in the construction sector, it is important to learn lessons from the manufacture industry where the automation technology and industrialized automation systems have been very well-developed and widely used in a process of continuous innovations over the past many decades, and this can significantly change the landscape of construction management in terms of professional competence and resources efficiency oriented performance toward the best practice. The adoption of automatic systems in construction projects brings the opportunity for professionals to reconstruct ( Morris, 2013 ) management procedure and associated activities and systems.

For interdisciplinary digital innovation in construction management, it has been learnt from past research and development that both decent deep learning from and efficient DIK sharing in multiple disciplinary areas are necessary and beneficial for a dedicated construction management team; in addition, a fast paced innovation process driven by well-organized collaboration under the Blue Ocean strategy ( Kim and Mauborgne, 2004 ) can be achieved through team-based multi-disciplinary learning, which can foster as well as enable powerful integrations of new digital DIK compounds into existing construction management. For example, the Asta Powerproject ( Elecosoft, 2018 ), which was originally developed for construction planners to develop and maintain project schedules by using the critical path method (CPM) like other same type of software packages for managing construction schedule, has now evolved to be a powerful 4D planning solution by linking project plans made by construction planners to 3D models provided by design engineers so as to match the need for adopting BIM in construction management. The multidisciplinary connection realized in this software package has demonstrated the advantage of further research and development in leading the way forwards. A continuous leadership in research and development is therefore inevitable by providing new solutions on not only Construction Informatics but also Construction Automation, and those innovative digital solution can satisfy new needs for digitalization across various interconnected disciplines within the construction project environment to serve more (wider and deeper) in required management services.

Megaproject Delivery

The fourth grand challenge to discuss is the delivery of megaproject with regard to satisfactory performance toward targets on life-cycle cost, quality of the built environment, resources use, and staged schedule, etc. A megaproject is a large-scale capital project typically costing more than US $1 billion ( PricewaterhouseCoopers, 2014 ), and it can be considered as a subset of major projects which have a wide scope of project costing above US100m for example. Megaproject has its uniqueness in terms of their significant and substantial impacts on social, technical, economic, environmental and political (STEEP) spheres. Generally speaking, these impacts are related to the big set of designed functions and service capacities under the purpose to transform public services and to deliver a robust infrastructure system to serve people and/or the nature in both short and longer term. There have been a huge amount of lessons learnt from past practices on megaproject development and operation across the world. One of the significant and persistent problems in megaproject delivery is the overruns on cost and time against estimated budget and schedule, and this has been widely recognized as specific megaproject risks ( Flyvbjerg et al., 2003 ) and the need for mature risk management ( Jia et al., 2013 ). It is therefore a grand challenge for further research and development to explore better technical solutions that are capable to support significant performance improvement on construction management in megaproject delivery. From this point of view, the description here about the grand challenge in megaproject delivery focuses on two relevant issues, including megaproject knowledge, and knowledge-driven solutions.

Megaproject Knowledge

It is evident through the author's extensive literature review and observations from both research and practices that a new research frontier in megaproject management with regard to scope, contents and potentials in relation to challenges, methodologies and solutions has emerged from a series of initiatives in focused research and practices. Table 6 is used to summarize the author's literature review in relation to megaproject knowledge, and it covers a range of topics about the performance of megaproject delivery. According to this summary, publications from research and practices around the world, especially from world's top economies, have accumulated a quick increase of megaproject knowledge in the past decade, and can strongly foster and support further research and development being embarked on this new frontier for research into megaproject delivery. As summarized in Table 6 , accumulated knowledge for megaproject delivery can be classified in the following four categories of publications to form a new landscape of dedicated research:

• Books on various issues relating to megaproject sustainability with regard to STEEP issues;

• Books on methodological issues about successful megaproject delivery in relation to Decision making, Project finance, Project governance, Project leadership, Multi-stakeholder lessons learned, Project procurement, Management solutions, and Management theories;

• Themed collection of research articles in 12 international journals; and

• Practitioners' learning legacy on megaproject delivery.

www.frontiersin.org

Table 6 . Classified publications on megaproject delivery.

The purpose of Table 6 is to develop a knowledge structure in terms of important issues relevant to performance improvement in megaproject delivery. Knowledge materials that were used to establish this structure include books, themed issues of journals, and practitioners' learning legacy. With regard to other types of relevant publications such as numerous individual articles published in journals and newspapers, in addition to case oriented study, a further review and collection can be conducted to verify and improve this structure, to enrich the collection of knowledge materials, and to incorporate megaproject knowledge into CMBOK. As it is always important to use DIK in both effective and efficient way in construction management practice, one challenge in front of further research and development is inevitably to focus on knowledge-driven solutions, which are expected to provide well-informed decision making support in areas relating to construction management. For megaproject, due to the scale and complexity of management, the value and power of structured knowledge reuse are expected and in need for proofs from future practices.

Knowledge-Driven Solutions

Knowledge-driven solutions refer to techniques and tools that can facilitate an effective and efficient use of knowledge in dealing with questions or problems in management practices. For megaproject delivery, it is assumed that one possible solution to effectively tackle the problem on overruns within an enlarged project scale, which is probably beyond the one where traditional theories, techniques and processes can work well for small-size projects, is to deploy significant technical enhancement through the development and enablement of re-engineering-led leadership and capability on various aspects of construction management. In addition to the adoption of digitalized tools to increase productivity at work stages, knowledge-driven solutions that can facilitate a thorough use of DIK in construction management are reckoned to improve the quality of professional services and expected outcomes with regard to contract, legislation, and professional code, etc.; and to increase the momentum that the use of DIK can add into the culture and impacts of construction management enterprises.

Figure 3 is used here as an example to illustrate how knowledge-driven solutions can be crafted for decision making support in a DIK immersive environment of megaproject management. It aims to establish possible connections among five solutions, including:

• Information models such as BIM and CIM to accumulate DIK from stakeholders and site of the megaproject,

• Megaproject case base to store DIK from current and past megaprojects,

• Analytic network process to reuse DIK to identify priorities among project related options,

• Artificial neural network to reuse DIK to derive conclusions for individual project related goals, and

• System dynamics to reuse DIK to predicate possibilities upon specific project related issues.

www.frontiersin.org

Figure 3 . Knowledge-driven solutions for megaproject management.

This figure also provides indications about all connections across exemplary solutions to clarify how stakeholders and experts can work together within DIK immersive project environment where various ways of using knowledge are made available and integrated toward better-performed services in construction management.

An example of research into the use of knowledge-driven solutions to deal with the big issue on cost and time overruns in megaproject delivery is the experimental case studies conducted by Boateng et al. (2017) who explored the integrative use of ANP ( Saaty, 1996 ) and system dynamics (SD) ( Sterman, 1992 ) to predict cost and time overruns in the Edinburgh Tram Network project, which has a total capital cost of approximately £776 million ( Cardownie, 2017 ). The outcome from their experiment provided a promising accuracy above 80% in prediction on cost and time overruns, and the simulation method can be interactively used in project management to achieve optimized delivery processes across stages by timely adjusting errors that may cause problems. While it is necessary to reinforce structural and governance arrangements ( Croft et al., 2016 ) in megaproject delivery, this research initiative and outcome is making a suggestion on the necessity to incorporate disruptive technical solutions in megaproject delivery, and has attracted practitioners' interest. As described by Davies et al. (2009) , innovation through process-oriented systems integration by incorporating lean thinking ( Womack and Jones, 1996 ) can significantly improve the performance of megaproject delivery. It is therefore anticipated that disruptive innovations such as the knowledge-driven systems through introducing the usages of new theories and technologies into megaproject management can effectively tackle the persistent problem such as the overruns on budget and schedule, and there is an array of value proposition canvases ( Osterwalder et al., 2014 ) for reconstructing project management ( Morris, 2013 ) toward proactive results through further practice-oriented exploratory research.

Regarding the challenge on megaproject delivery, as it is defined in this article as the one for best practices for which methods described under, the first three challenges need to be used in an integrative way.

Conclusions

This article provides brief discussions on four grand challenges connecting to further research and development in the subject field of construction management with regard to three technical domains on people/workforce, products/production and processes, respectively. In addition to an extensive review into current national/regional strategies for the construction sector in major economies, the four grand challenges were identified through the author's observations on academic research and professional practices in relation to the body of professional knowledge, intelligent management systems, interdisciplinary digital innovation, and megaproject delivery. It is the author's expectation that discussions presented here on the four grand challenges could be useful to inform further research and development at the Frontiers of Construction Management for the dependable built environment.

Contributions

The main contribution of this article is to provide an initial description about four identified grand challenges in construction management together with regard to further research and development under practice oriented strategies at various scales. In order to detail the four grand challenges in relation to leadership development and capability growth for the goals on both dependability and productivity in the provision of construction management services, this article has attempted to clarify four related issues for the advancement of construction management profession, and these include:

• A preliminary structure of cognitive domains of CMBOK,

• The definition with a conceptual model of iCMS,

• A research and development strategy oriented review to further digital innovations under the three knowledge domains of CM, and

• A detailed summary on the structure and tools of using knowledge materials to inform further research and practices for leadership development as well as capability growth in megaproject delivery.

The structure adopted to derive the four grand challenges is generic and could be useful for further discussions on other grand challenges.

Framework and Advantages

The connections among research and development activates across the four grand challenges can form a generic framework to advance the construction management profession. These connections need to include the use of the proposed CMBOK framework as a guideline to develop iCMS, make and perform constant interdisciplinary digital innovations, and conduct improved megaproject management. In return, continuous outcomes and usages of new technical solutions from research and development in iCMS and interdisciplinary digital innovations, as well as megaproject management practice can provide new compounds of CMBOK. The reason for setting up these coherent connections is that it is an essential requirement for such intelligent systems as well as interdisciplinary digital innovations to be both applicable and useful in construction management practices, including those in megaproject delivery. It is therefore an important task for construction management professionals to specify decent connections to CMBOK when a new technical solution is to be developed and adopted. The advantages of using CMBOK framework to guide and connect research and development activities in construction management can be recognized from various sides, and these include standardizations in not only research and development but also professional services, the enrichment of professional knowledge, constant CPD, and extensive interdisciplinary collaborations, etc.

Limitations

This article is based on the author's literature review and observations in construction management, and these were used in discussions on the four grand challenges through qualitative analysis. Although reviewers' comments have hugely helped him to conduct further research in order to illustrate a more vivid landscape with regard to the four identified grand challenges in construction management, there is limited time for him to make the description comprehensive with more details in both qualitative and quantitative way. Further research is inevitably necessary so as to not only describe the four grand challenges in more details, but also identify more technical challenges inside different scopes so as to pursue excellent professional services in construction management.

Climate change and variability has been giving challenges to construction management professionals around the world over the past century ( Stehr and von Storch, 2000 ). In the pursuit of dependability and productivity of professional services in the life cycle of the built environment, professionals need to have thorough considerations upon constant interactions of complex variables between the built environment and the social environment within the natural environment in both short and longer term. While the four grand challenges discussed in this article were derived from a literature review on current national/regional strategies for the construction industry in world top economies, the author would like to recommend further research and development for long-term competence enhancement in areas relating to the four grand challenges, and these advances include:

• A national/regional CMBOK to support the provision of construction management services in the ear of Industry 4.0, and it can be used to develop relevant standards for construction management,

• Knowledge-driven solutions for thorough use of DIK within an immersive environment for construction management, and

• Techniques and tools for construction management incorporating with site automation, and

• Theories, techniques and tools to tackle overrun problems in megaproject management.

About the Author

The author is specialty chief editor for the Construction Management section of Frontiers in Built Environment. He has relevant experiences accumulated from academic and professional services worldwide since later 1980s. He has engaged in more than 50 funded research projects totalling over £5m from research councils and industry partners in UK and internationally. In collaborations with colleagues worldwide, he has made contributions to more than 200 publications, including more than 50 publications collected on the Web of Science (Researcher ID C-1587-2010), in addition to some other publications collected at ORCID 0000-0003-0212-1140 and Google Scholars. He is member of the management committee of COST Action TU1003 (2011-2015) for research into the effective design and delivery of megaprojects in the European Union. He serves as member at several relevant technical committees, including committees on Airport Planning and Operations, and the CEBOK, respectively, at ASCE, and committees on Facilities Management, and Project, Programme and Portfolio Management, respectively, at BSI.

Author Contributions

The author confirms being the sole contributor of this work and has approved it for publication.

Conflict of Interest Statement

The author declares that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.

Acknowledgments

This article is prepared for the launch of the specialty section on construction management at the international open-access journal of Frontiers in Built Environment. The author would like to thank Professor Izuru Takewaki, the Chief Editor of the Frontiers in Built Environment for huge support in developing the specialty section on Construction Management. Ruth Miller, Journal Development Manager; Emily Young, and Sarah Yardley, Journal Development Specialists; and other colleagues at Frontiers have all provided strong support and thorough help in the establishment of this specialty section and its research topics. Special thanks to Nicholas Fraser, former Journal Development Manager at Frontiers, for the development of the new specialty section at initial stage. The author would also like to thank all colleagues on the editorial board as either Associate Editor or Review Editor for their strong support and contributions to the specialty section on Construction Management. The author would like to express special thanks to Dr. Conor Mooney at the Council of Europe Development Bank for his strong support as Associate Editor to the establishment of this specialty section at Frontiers in Built Environment.

The author is deeply grateful to his mentors and colleagues from both academia and industry around the world for their help and giving him great opportunities to learn from them more or less in the past three decades. His learning experience with them are extensive, useful, and inspiring.

The unique opportunity that colleagues at Frontiers give to the author for this article focusing on grand challenges in construction management is huge inspirational for him to rethink about the research and development of construction management for both short and longer term.

This article was finalized at the Royal Society of Edinburgh where the author was attending the IDE (Institute of Demolition Engineers) Scottish Seminar in July 2018. It's an inspiring experience there for the author to further think about fundamental questions and answers in relation to the long-term leadership development and capability growth for considerate construction management to fulfill professional responsibilities on total project-oriented sustainability, which relies on a spur of engineering and management genius to spread enlightenment ideas among professionals so as to provide quality services that can support to create and sustain dependable built environment through project-oriented activities that have minimum adverse impacts to people and the nature.

This article cannot achieve the level of publication without a great amount of very insightful comments from reviewers. The author would like to acknowledge their help to make this publication possible. The author would also like to thank colleagues in the Review Operations Team and the Engineering Production Office at Frontiers for their efficient professional support.

For the specialty section on Construction Management at Frontiers in Built Environment, the author would like to invite colleagues working in either research or practice in related areas to come to share valuable experiences to foster further research and development worldwide. The more contributions from colleagues, the huge impacts that this specialty section can make to the long-term development of the construction management profession at national and international scope.

ACCE (2017). Annual Report 2016–2017 . San Antonio, TX: The American Council for Construction Education (ACCE).

Alarcón, L. (1997). Lean Construction . London: CRC Press.

Google Scholar

Allee, V. (1997). The Knowledge Evolution: The Knowledge Evolution: Expanding Organizational Intelligence . Newton, MA: Butterworth-Heinemann.

Allplan (2018). Intelligent Cost Management . München: Allplan Deutschland GmbH. Available online at: https://www.allplan.com/fileadmin/user_upload/countries/international/pdfs/references/Design2Cost_CaseStudy_Elwert-Grundschule_EN.pdf (accessed September 23, 2018).

Alonso, A., Dallmeier, F., and Servat, G. P. (2013). Monitoring Biodiversity: Lessons from a Trans-Andean Megaproject . Washington, DC: Smithsonian Institution Scholarly Press.

AlSehaimi, A., Koskela, L., and Tzortzopoulos, P. (2013). Need for alternative research approaches in construction management: case of delay studies. J. Manag. Eng. 29:4. doi: 10.1061/(ASCE)ME.1943-5479.0000148

CrossRef Full Text | Google Scholar

Anumba, C. J., Egbu, C. O., and Carrillo, P. M. (2005). Knowledge Management in Construction . Oxford: Blackwell Publishing Ltd.

Arditi, D., and Polat, G. (2010). Graduate education in construction management. J. Profession. Iss. Eng. Edu. Pract. 136:3. doi: 10.1061/(ASCE)EI.1943-5541.0000014

ASCE (2008). Civil Engineering Body of Knowledge for the 21st Century, 2nd Ed . Reston, VA: American Society of Civil Engineers (ASCE).

ASCE (2019). Civil Engineering Database . Reston, VA: American Society of Civil Engineers (ASCE).

PubMed Abstract

Balfour Beatty (2017). Innovation 2050: A Digital Future for the Infrastructure Industry . London: Balfour Beatty plc.

BCA (2016). BIM for DfMA (Design for Manufacturing and Assembly) Essential Guide . Singapore: Building and Construction Authority (BCA).

Bechtel (2018). The Bechtel Report 2018 . Reston, VA: Bechtel Corporation.

BEIS (2018). Industrial Strategy: Construction Sector Deal . London: Department for Business, Energy & Industrial Strategy (BEIS).

Berechman, J. (2018). The Infrastructure We Ride On: Decision Making in Transportation Investment . Berlin: Palgrave Macmillan, Springer.

Bernold, L. E., and AbouRizk, S. M. (2010). Managing Performance in Construction . Hoboken, NJ: John Wiley & Sons, Inc.

BGS (2012). Accessing Subsurface Knowledge—ASK Network . Edinburgh: British Geological Survey (BGS).

BIS (2013). Construction 2025: Industrial Strategy for Construction—Government and Industry in Partnership . London: Department for Business, Innovation & Skills (BIS).

Black, E., and Pettitt, J. (2018). Boston Dynamics is Putting its Robotic Dog, Spot, to Work on Construction Sites . Tokyo: CNBC LLC.

Blanco, J. L., Fuchs, S., Parsons, M., and Ribeirinho, M. J. (2018). Artificial Intelligence: Construction Technology's Next Frontier . New York, NY: McKinsey & Company. Available online at: https://www.mckinsey.com/industries/capital-projects-and-infrastructure/our-insights/artificial-intelligence-construction-technologys-next-frontier (accessed September 23, 2018).

BMUB (2016). Climate Action Plan 2050: Principles and Goals of the German Government's Climate Policy . Berlin: Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety (BMUB).

BMWi. (2018). Federal Government Adopts Artificial Intelligence Strategy . Berlin: Federal Ministry for Economic Affairs and Energy (BMWi).

Boateng, P., Chen, Z., and Ogunlana, S. (2017). Megaproject Risk Analysis and Simulation: A Dynamic Systems Approach . Bingley: Emerald Publishing Limited.

Bock, T. (2015). The future of construction automation: technological disruption and the upcoming ubiquity of robotics. Automat. Construct. 59, 113–121. doi: 10.1016/j.autcon.2015.07.022

Bock, T., and Linner, T. (2016). Construction Robots: Elementary Technologies and Single-Task Construction Robots . Cambridge: Cambridge University Press.

Briesemeister, J. K. (2018). Managing Complex Construction Projects: A Systems Approach . New York, NY: Auerbach Publications.

Brookes, N., Chen, Z., and Lo Storto, C. (2012). International Journal of Architecture, Engineering and Construction . Special Issue on Planning and Managing Sustainable Infrastructural Megaprojects: Call for Papers. Available online at: http://www.iasdm.org/journals/download/call-for-papers-pmsim.pdf (accessed September 23, 2018).

Brookes, N., Chen, Z., and Lo Storto, C. (2014). Editorial: Special issue on infrastructure megaprojects. Int. J. Architect. Eng. Construct. 3:2. Available online at: http://www.iasdm.org/journals/index.php/ijaec/issue/view/10

Brookes, N., and Zhang, S. (2014). Call for Papers on Megaprojects: Global Similarities and Global Differences . Available online at: http://blog.sciencenet.cn/blog-307182-823077.html (accessed September 23, 2018).

Browne, A. J. (2015). LAPSSET: The History and Politics of an Eastern African Megaproject . London: The Rift Valley Institute.

Brunn, S. D. (2011). Engineering Earth: The Impacts of Megaengineering Projects . Dordrecht: Springer.

BSI (2006). PD 6079-4:2006 Project Management. Guide to Project Management in the Construction Industry . London: The British Standards Institution (BSI).

BSI (2014). BS EN 60300-1:2014 Dependability Management—Part 1: Guidance for Management and Application . London: The British Standards Institution (BSI).

Campbell, S., De Beer, J., Van der Meulen, M., Mielby, S. B., Van Campenhout, I., and Venvik, G. (2017). COST Action TU1206 Final Achievement Report . Belgium: COST Association.

Cardownie, S. (2017). Witness Statement of Steve Cardownie . Edinburgh: The Edinburgh Tram Inquiry.

Castro-Lacouture, D., Bryson, L. S., Maynard, C., Williams II, R. L., and Bosscher, P. (2007). “Concrete paving productivity improvement using a multi-task autonomous robot,” in Proceedings of the 24th International Symposium on Automation and Robotics in Construction (ISARC) (Kochi), 223–228.

Chen, Q., García de Soto, B., and Adey, B. T. (2018a). Construction automation: research areas, industry concerns and suggestions for advancement. Automat. Construct. 94, 22–38. doi: 10.1016/j.autcon.2018.05.028

Chen, Z. (2007). Multi-criteria Decision-Making for the Sustainable Built Environment. Reading: University of Reading.

Chen, Z. (2017). “The principles of facilities management and case studies,” in Proceedings of ARCOM and BEAM Centre Early Career Researcher and Doctoral Workshop on Building Asset Management, 2017-01-20 . Glasgow: Glasgow Caledonian University.

Chen, Z. (2018). Standards Planning and Approval: Project Management Systems . Internal document. Project no. 9019-02604. London: British Standards Institution (BSI).

Chen, Z., Agapiou, A., and Smith, S. (2016). Themed issue on megaproject management: call for papers. Proc. ICE Manag. Procurement Law 171:2. doi: 10.13140/RG.2.2.32373.37602

CrossRef Full Text

Chen, Z., Agapiou, A., and Smith, S. (2018b). Editorial: Themed issue on megaproject management. Proc. ICE Manag. Procurement Law 171:2. doi: 10.1680/jmapl.2018.171.2.43

Chen, Z., Chen, H., and Wang, C. (1999). An expert system for crack diagnosis in cast-in-place reinforced concrete structures (in Chinese). Construct. Technol. 28, 24–25.

Chen, Z., and Li, H. (2006). Environmental Management in Construction: A Quantitative Approach . London and New York, NY: Taylor & Francis.

Chen, Z., Li, H., Kong, S. C. W., Hong, J., and Xu, Q. (2006a). E-commerce system simulation for construction and demolition waste exchange. Automat. Construct. 15, 706–718. doi: 10.1016/j.autcon.2005.09.003

Chen, Z., Li, H., Kong, S. C. W., and Xu, Q. (2006b). An analytic knowledge network process for construction entrepreneurship education. J. Manag. Dev. 25, 11–27.

Chen, Z., Maiti, S., and Agapiou, A. (2017). “Evidence-based safety management in building refurbishment,” in Proceedings of International Research Conference (11-12/09/2017) (Salford: International Council for Research and Innovation in Building and Construction (CIB) and University of Salford), 119–128.

Chen, Z., and Whitehead, C. (2015). “Call for papers: themed issue on megaproject sustainability,” in Proceedings of the Institution of Civil Engineers—Engineering Sustainability (London, UK).

Chen, Z., and Xu, W. (1996). Intelligent methods in building construction (in Chinese). Build. Construct. 18, 44–47.

Chou, J.-S., Lin, C.-W., Pham, A.-D., and Shao, J.-Y. (2015). Optimized artificial intelligence models for predicting project award price. Automat. Construct. 54, 106–115. doi: 10.1016/j.autcon.2015.02.006

CIOB (2014). Code of Practice for Project Management for Construction and Development, 5th Ed . Oxford: Wiley-Blackwell.

CIOB (2015). Time and Cost Management Contract Suite . Ascot: The Chartered Institute of Building (CIOB).

CIOB (2018a). Overseas Accredited Institutions . Ascot: The Chartered Institute of Building (CIOB).

CIOB (2018b). Improving Quality in the Built Environment . Ascot: The Chartered Institute of Building (CIOB).

CIOB (2018c). Guide to Good Practice in the Management of Time in Major Projects: Dynamic Time Modelling, 2nd Ed . Oxford: Wiley-Blackwell.

CIOB (2018d). Accident Investigation and Root Cause Analysis . Ascot: The Chartered Institute of Building (CIOB).

CIOB. (2010). CIOB's Professionalism: An Inclusive Definition of Construction Management . Ascot: Chartered Institute of Building (CIOB).

Clarivate (2019). Web of Science . London: Clarivate Analytics.

Croft, C., Buck, M., and Adams, S. (2016). Lessons Learned from Structuring and Governance Arrangements: Perspectives at the Construction Stage of Crossrail . London: Crossrail Ltd.

Crossrail (2018). Crossrail Learning Legacy . London: Crossrail Ltd.

CSIC (2017). Annual Review 2017 . Cambridge: The Cambridge Centre for Smart Infrastructure and Construction (CSIC).

Dalkir, K. (2017). Knowledge Management in Theory and Practice, 3rd Ed . Cambridge, MA: The MIT Press.

Davies, A., Gann, D., and Douglas, T. (2009). Innovation in megaprojects: systems integration at London Heathrow Terminal 5. California Manag. Rev. 51, 101–125. doi: 10.2307/41166482

De Laubier, R., Wunder, M., Witthöft, S., and Rothballer, C. (2018). Will 3D Printing Remodel the Construction Industry? Boston, MA: The Boston Consulting Group (BCG).

DHS (2012). Office of Infrastructure Protection Strategic Plan: 2012–2016 . Washington, DC: U.S. Department of Homeland Security (DHS).

DHS (2013). NIPP 2013: Partnering for Critical Infrastructure Security and Resilience . Washington, DC: U.S. Department of Homeland Security (DHS).

Dong, J., Tang, L., Gong, W., Utili, S., and Crosta, G. (2018). Special Issue on Mega Engineering Projects in Challenging Geological Environments—A Modern Perspective: Call for Papers . Elsevier.

DOT (2018). Strategic Plan for FY 2018–2022 . Washington, DC: U.S. Department of Transportation (DOT).

EC (2012). Strategy for the Sustainable Competitiveness of the Construction Sector and its Enterprises . Communication from the Commission to the European Parliament and the Council. Brussels: European Commission (EC).

Elecosoft (2018). Powerproject: The Power Behind Successful Projects . Haddenham: Elecosoft UK Ltd.

EMAP (2017). CN Specialists Index 2017 . London: EMAP Ltd.

EMAP (2018). Construction Industry Company League Tables . London: EMAP Ltd.

ENR (2018). ENR 2018 Top 400 Contractors . New York, NY: Engineering News-Record (ENR).

EPA (2017). Policy on Water Infrastructure Sustainability . Washington, DC: United States Environmental Protection Agency (EPA).

ESRI (2002). GIS Solutions for Community Development . Redlands, CA: ESRI.

ESRI (2007). GIS Solutions for Surveying . Redlands, CA: ESRI.

ESRI (2008). GIS Solutions for Civil Engineering . Redlands, CA: ESRI.

ETI (2018). Edinburgh Tram Inquiry: Evidence . Edinburgh: The Edinburgh Tram Inquiry (ETI).

Eynon, J. (2013). The Design Manager's Handbook . Chichester: John Wiley & Sons Ltd.

Eynon, J. (2016). Construction Manager's BIM Handbook . Chichester: John Wiley and Sons Ltd.

Fadaee, S., and Schindler, S. (2017). Call for Papers on Megaprojects. Environment and Society: Advances in Research . Oxford, UK: Berghahn Books.

Faro (2019). BuildIT Construction . Lake Mary, FL: Faro Technologies, Inc.

FHWA (2017). e-Construction and Partnering: A Vision for the Future . Federal Highway Administration (FHWA), U. S. Departments of Transportation (DOT).

Fischer, M., Rajagopal, R., and Nikkhoo, P. (2018). Any Time Data Thinking Prototype for Construction Project Managers . Stanford, CA: Stanford Center for Integrated Facility Engineering (CIFE).

Flyvbjerg, B. (2015). Call for papers—special issue on “Classics in Megaproject Management”. Int. J. Project Manag. 33, 1–2. doi: 10.1016/j.ijproman.2014.08.002

Flyvbjerg, B. (2017). The Oxford Handbook of Megaproject Management . Oxford: Oxford University Press.

Flyvbjerg, B., Bruzelius, N., and Rothengatter, W. (2003). Megaprojects and Risk: An Anatomy of Ambition . Cambridge: Cambridge University Press.

Flyvbjerg, B., and Turner, J. R. (2018). Do classics exist in megaproject management? Int. J. Project Manag. 36, 334–341. doi: 10.1016/j.ijproman.2017.07.006

Frick, K. T. (2016). Remaking the San Francisco–Oakland Bay Bridge: A Case of Shadowboxing with Nature . Abingdon and New York, NY: Routledge.

Future Cities Catapult (2017). Underground Asset Mapping in the UK . London: Urban Innovation Centre.

Galloway, P. D., Nielsen, K. R., and Dignum, J. L. (2012). Managing Gigaprojects: Advice from Those Who've Been There, Done That . Reston, VA: American Society of Civil Engineers (ASCE).

García de Soto, B., Agustí-Juan, I., Hunhevicz, J., Joss, S., Graser, K., Habert, G., et al. (2018). Productivity of digital fabrication in construction: cost and time analysis of a robotically built wall. Automat. Construct. 92, 297–311. doi: 10.1016/j.autcon.2018.04.004

Gil, N., Lundrigan, C., Pinto, J. K., and Puranam, P. (2017). MegaProject Organization and Performance: The Myth and Political Reality . Newtown Square, PA: Project Management Institute, Inc.

Grahovac, D., and Devedzic, V. (2010). COMEX: a cost management expert system. Expert Syst. Appl. 37, 7684–7695. doi: 10.1016/j.eswa.2010.04.073

Greiman, V. A. (2013). Megaproject Management: Lessons on Risk and Project Management from the Big Dig . Hoboken, NJ: John Wiley and Sons, Inc.

Griffith, A. (2010). Integrated Management Systems for Construction: Quality, Environment and Safety . London: Routledge.

Guo, C., and Sheng, Z. (2017). Infrastructure Mega-Project Management: Call for Papers . Beijing: Higher Education Press.

Hagan, G., Baltov, M., and Brookes, N. (2012). Megaproject management: the state of the art. Organ. Technol. Manag. Construct. 4, 567–569.

Hardin, B., and McCool, D. (2015). BIM and Construction Management: Proven Tools, Methods, and Workflows, 2nd Ed . Indianapolis, IN: John Wiley and Sons, Inc.

Hart, L. (2015). Procuring Successful Mega-Projects: How to Establish Major Government Contracts without Ending up in Court . Surrey: Gower Publishing Ltd.

Harty, C. (2005). Innovation in construction: a sociology of technology approach. Build. Res. Info. 33, 512–522. doi: 10.1080/0961321050028860

Hatem, D. J., and Corkum, D. H. (2010). Megaprojects: Challenges and Recommended Practices . Washington, DC: American Council of Engineering Companies.

Hawksworth, J., Berriman, R., and Goel, S. (2018). An International Analysis of the Potential Long Term Impact of Automation . London, UK: PricewaterhouseCoopers LLP.

HSE (2015). Managing health and Safety in Construction: Construction (Design and Management) Regulations 2015 . Bootle: Health and Safety Executive (HSE).

HURD (2017). The 13th Five-Year Plan for Construction Industry Development . Beijing: Ministry of Housing and Urban-Rural Development (HURD) of the People's Republic of China.

ICE (2019). ICE Library . London: Institution of Civil Engineers (ICE).

IPA (2016). Government Construction Strategy: 2016–2020 . London: The Infrastructure and Projects Authority (IPA).

ISO (2008). ISO 22263:2008 Organization of Information about Construction Works—Framework for Management of Project Information . Geneva: International Organization for Standardization (ISO).

ISO (2009a). ISO/TR 16738:2009 Fire-Safety Engineering—Technical Information on Methods for Evaluating Behaviour and Movement of People . Geneva: International Organization for Standardization (ISO).

ISO (2009b). ISO 23601:2009 Safety Identification—Escape and Evacuation Plan Signs . Geneva: International Organization for Standardization (ISO).

ISO (2011). ISO 21542:2011 Building Construction—Accessibility and Usability of the Built Environment . Geneva: International Organization for Standardization (ISO).

ISO (2012). ISO 21500:2012 Guidance on Project Management . Geneva: International Organization for Standardization (ISO).

ISO (2013). ISO 16354:2013 Guidelines for Knowledge Libraries and Object Libraries . Geneva: International Organization for Standardization (ISO).

ISO (2015a). ISO 9001:2015 Quality Management Systems—Requirements . Geneva: International Organization for Standardization (ISO).

ISO (2015b). ISO/TS 22318:2015 Societal Security—Business Continuity Management Systems—Guidelines for Supply Chain Continuity . Geneva: International Organization for Standardization (ISO).

ISO (2017a). ISO and Construction . Geneva: International Organization for Standardization (ISO).

ISO (2017b). ISO 15686-5:2017 Buildings and Constructed Assets—Service Life Planning—Part 5: Life-cycle Costing . Geneva: International Organization for Standardization (ISO).

ISO (2017c). ISO 44001:2017 Collaborative Business Relationship Management Systems—Requirements and Framework . Geneva: International Organization for Standardization (ISO).

ISO (2017d). ISO 20400:2017 Sustainable Procurement—Guidance . Geneva: International Organization for Standardization (ISO).

ISO (2018a). Standards Catalogue: ISO/TC 59/SC 13 Organization and Digitization of Information about Buildings and Civil Engineering Works, Including Building Information Modelling (BIM) . Geneva: International Organization for Standardization (ISO).

ISO (2018b). Standards Catalogue: ISO/TC 59/SC 18 Construction Procurement . Geneva: International Organization for Standardization (ISO).

ISO (2018c). Standards Catalogue: ISO/TC 59/SC 14 Design life . Geneva: International Organization for Standardization (ISO).

ISO (2018d). Standards Catalogue: ISO/TC 59/SC 17 Sustainability in Buildings and Civil Engineering Works . Geneva: International Organization for Standardization (ISO).

ISO (2018e). Standards Catalogue: ISO/TC 267 Facility Management . Geneva: International Organization for Standardization (ISO).

ISO (2018f). The Integrated Use of Management System Standards . Geneva: International Organization for Standardization (ISO).

ISO (2018g). ISO 31000:2018 Risk Management—Guidelines . Geneva: International Organization for Standardization (ISO).

ISO (2018h). ISO 22326:2018 Security and Resilience—Emergency Management—Guidelines for Monitoring Facilities with Identified Hazards . Geneva: International Organization for Standardization (ISO).

ISO (2018i). Standards Catalogue: ISO/TC 92 Fire Safety . Geneva: International Organization for Standardization (ISO).

ISO (2018j). Standards Catalogue: ISO/TC 195 Building Construction Machinery and Equipment . Geneva: International Organization for Standardization (ISO).

ISO (2018k). Standards Catalogue: ISO/TC 260 Human Resource Management . Geneva: International Organization for Standardization (ISO).

ISO (2018l). Standards Catalogue: ISO/TC 46 Information and Documentation . Geneva: International Organization for Standardization (ISO).

ISO (2018m). Standards Catalogue: ISO/TC 207 Environmental Management . Geneva: International Organization for Standardization (ISO).

ISO (2018n). Standards Catalogue: ISO/TC 269 Railway Applications . Geneva: International Organization for Standardization (ISO).

ISO (2018o). Standards Catalogue: ISO/TC 301 Energy Management and Energy Savings . Geneva: International Organization for Standardization (ISO).

ISO (2018p). Standards Catalogue: ISO/TC 258 Project, Programme and Portfolio Management . Geneva: International Organization for Standardization (ISO).

Jia, G., Ni, X., Chen, Z., Hong, B., Chen, Y., Yang, F., et al. (2013). Measuring the maturity of risk management in large-scale construction projects. Automat. Construct. 34, 56–66. doi: 10.1016/j.autcon.2012.10.015

Jones, G. R., and George, J. M. (2016). Essentials of Contemporary Management, 7th Ed . New York, NY: McGraw-Hill Education.

Kajima (2018). Kajima Corporate Report 2018 . Tokyo: Kajima Corporation.

Kim, W. C., and Mauborgne, R. (2004). Blue Ocean Strategy . Brighton, MA: Harvard Business Review Press.

PubMed Abstract | Google Scholar

Kostka, G., and Fiedler, J. (2016). Large Infrastructure Projects in Germany: Between Ambition and Realities . Berlin: Palgrave Macmillan, Springer.

Kwegyir-Afful, C. (2018). Delivering Successful Megaprojects: Key Factors and Toolkit for the Project Manager . Amington: KAPM Services Limited.

Kwon, N., Park, M., Lee, H.-S., Ahn, J., and Kim, S. (2017). Construction noise prediction model based on case-based reasoning in the preconstruction phase. J. Construct. Eng. Manag. 143:04017008. doi: 10.1061/(ASCE)CO.1943-7862.0001291

Laing O'Rourke (2017) Annual Report and Consolidated Financial Statements for the Year Ended 31 March 2017 . Dartford: Laing O'Rourke.

Lehtonen, M., Joly, P. B., and Aparicio, L (2017) Socioeconomic Evaluation of Megaprojects: Dealing with Uncertainties . London: Routledge.

LGA (2018). National Construction Category Strategy 2018 . London: Local Government Association (LGA).

Li, H., Chan, N., Huang, T., Guo, H.L., Lu, W., and Skitmore, M. (2009). Optimizing construction planning schedules by virtual prototyping enabled resource analysis. Automat. Construct. 18, 912–918. doi: 10.1016/j.autcon.2009.04.002

Li, H., Chen, Z., Yong, L., and Kong, S.C.W. (2005). Application of integrated GPS and GIS technology for reducing construction waste and improving construction efficiency. Automat. Construct. 14, 323–331. doi: 10.1016/j.autcon.2004.08.007

Li, H., and Guo, H. L. (2011). Editorial: Special issue on “Complexities in managing mega construction projects”. Int. J. Proj. Manag. 29, 795–796.

Li, Y., Lu, Y., and Cui, Q. (2016). Organizational Behaviour and Governance of Megaprojects: Call for Papers . Reston, VA: American Society of Civil Engineers (ASCE).

Locatelli, G., Gatti, S., van Marrewijk, A., and Pitsis, T. S. (2017). Call for Papers: The Present and Future of Contracting and Megaprojects . London, UK: SAGE Publications.

Love, P. E. D., and Li, H. (1998). From BPR to CPR—conceptualising re-engineering in construction. Business Process Manag. J. 4, 291–305. doi: 10.1108/14637159810238192

Luk, S., and Whitney, J. (1993). Megaproject: Case Study of China's Three Gorges Project . London: M. E. Sharpe, Inc.

Luo, H., Xiong, C., Fang, W., Love, P. E. D., Zhang, B., and Xi, O. (2018). Convolutional neural networks: computer vision-based workforce activity assessment in construction. Automat. Construct. 94, 282–289. doi: 10.1016/j.autcon.2018.06.007

Mascia, S. (2012). Project Psychology . London: Routledge.

MedSolutions (2013). Why Intelligent Cost Management? Bluffton, SC: eviCore healthcare.

Merrow, E. W. (2011). Industrial Megaprojects: Concepts, Strategies, and Practices for Success . Hoboken, NJ: John Wiley and Sons, Inc.

Merrow, E. W., and Nandurdikar, N. S. (2018). Leading Complex Projects: A Data-Driven Approach to Mastering the Human Side of Project Management . Hoboken, NJ: John Wiley and Sons, Inc.

Microsoft (2016). Reimagine Productivity with Microsoft Dynamics 365. Redmond, WA: Microsoft Corporation.

Morris, P. W. G. (2013). Reconstructing Project Management . Chichester: John Wiley and Sons, Inc.

NASEM (2007). Emerging Technologies for Construction Delivery. National Academies of Sciences, Engineering, and Medicine (NASEM) . Washington, DC: The National Academies Press.

NBS Research (2018). Digital Transformation in Architecture . Microsoft Corporation and the Royal Institute of British Architects (RIBA).

Nguyen, L. D., Chih, Y.-Y., and García de Soto, B. (2017). Knowledge areas delivered in project management programs: exploratory study. J. Manag. Eng. 33:1. doi: 10.1061/(ASCE)ME.1943-5479.0000473

Norris, E., Rutter, J., and Medland, J. (2013). Making the Games: What Government can Learn from London 2012 . London: Institute for Government.

Nunamaker, J. Jr, Briggs, R., and Romano, N. Jr. (2014). Collaboration Systems . New York, NY: Routledge.

Oakland, J., and Marosszeky, M. (2017). Total Construction Management . London: Routledge.

Ochieng, E., Price, A., and Moore, D. (2017). Major Infrastructure Projects: Planning for Delivery . London: Palgrave.

ODA (2011). Lessons Learned from the London 2012 Construction Project . London: Olympic Delivery Authority (ODA).

ODA (2015). Olympic Delivery Authority (ODA) . London: Department for Culture, Media and Sport. Available online at: https://www.gov.uk/government/organisations/olympic-delivery-authority

ONS (2009). UK Standard Industrial Classification of Economic Activities 2007 (SIC 2007): Structure and Explanatory Notes. Hampshire: Palgrave Macmillan.

Osterwalder, A., Pigneur, Y., Bernarda, G., Smith, A., and Papadakos, T. (2014). Value Proposition Design: How to Create Products and Services Customers Want . Hoboken, NJ: John Wiley and Sons.

Pellicer, E., Yepes, V., and Ortega, A. J. (2013). Method for planning graduate programs in construction management. J. Profession. Iss. Eng. Edu. Pract. 139:1. doi: 10.1061/(ASCE)EI.1943-5541.0000120

Pells, D. (2014). Call for Papers on Planning and Managing Infrastructure Megaprojects . Addison, TX: PM World Inc. Available online at: http://promaconafrica.org/index.php/2014/08/30/call-for-papers-on-managing-infrastructure-megaprojects/ (accessed February 27, 2019).

Plotch, P. M. (2015). Politics across the Hudson: The Tappan Zee Megaproject . New Brunswick: Rutgers University Press.

PMI (2016). Construction Extension to the PMBOK ® Guide . Newtown Square, PA: Project Management Institute (PMI).

PMI (2017). A Guide to the Project Management Body of Knowledge (PMBOK ® Guide), 6th Ed . Newtown Square, PA: Project Management Institute (PMI).

PricewaterhouseCoopers. (2014). Successful Capital Project Delivery: The Art and Science of Effective Governance . San Francisco, CA: PricewaterhouseCoopers LLP.

Priemus, H., Flyvbjerg, B., and van Wee, B. (2008). Decision-making on Mega-Projects: Cost–benefit Analysis, Planning, and Innovation . Cheltenham: Edward Elgar Publishing.

Priemus, H., and van Wee, B. (2013). International Handbook on Mega-Projects . Cheltenham: Edward Elgar Publishing.

Pryke, S. (2017). Managing Networks in Project-Based Organisations . Oxford: John Wiley and Sons Ltd.

Rafiei, M. H., and Adeli, H. (2018). Novel machine-learning model for estimating construction costs considering economic variables and indexes. J. Construct. Eng. Manag. 144:04018106. doi: 10.1061/(ASCE)CO.1943-7862.0001570

Ren, H. (2012). Megaproject Management (in Chinese) . Beijing: Science Press.

RIBA (2013). RIBA Plan of Work 2013 Overview . London: The Royal Institute of British Architects (RIBA).

RICS (2018). RICS Accredited Course . London: Royal Institution of Chartered Surveyors (RICS).

Rios, F. C., Chong, W. K., and Grau, D. (2015). Design for disassembly and deconstruction—challenges and opportunities. Procedia Eng. 118, 1296–1304. doi: 10.1016/j.proeng.2015.08.485

Rossi, E., and Stepic, R. (2015). Infrastructure Project Finance and Project Bonds in Europe . Basingstoke: Palgrave Macmillan.

Rumane, A. R. (2018). Quality Management in Construction Projects, 2nd Ed . Boca Raton, FL: CRC Press.

Russell, S., and Norvig, P. (2010). Artificial Intelligence: A Modern Approach, 3rd Ed . Upper Saddle River, NJ: Pearson Education, Inc.

Saaty, T. L. (1996). Decision making with Dependence and Feedback: The Analytic Network Process . Pittsburgh, PA: RWS Publications.

Santamaría, G. C. (2013). Urban Megaprojects: A Worldwide View . Bingley: Emerald Publishing Limited.

Scottish Parliament (2005). Building the Scottish Parliament: The Holyrood Project . Edinburgh: Scottish Parliament.

Shen, L., Zeng, S., and Tam, V. W.Y. (2017). Special edition: social responsibilities for the management of megaprojects. Int. J. Proj. Manag. 35, 1336–1337. doi: 10.1016/j.ijproman.2017.06.001

Sheng, Z. (2018). Fundamental Theories of Mega Infrastructure Construction Management: Theoretical Considerations from Chinese Practices . Cham: Springer.

Singh, A., and Ebeling, K. (1994). Construction process simulation using a standardized configuration and model. Proj. Manag. J. 25, 45–52.

Skanska (2018). Annual Report 2017 . Stockholm: Skanska AB.

Skibniewski, M. J. (1988). Framework for decision-making on implementing robotics in construction. J. Comput. Civil Eng. 2:2. doi: 10.1061/(ASCE)0887-3801(1988)2:2(188)

Smith, D. (2018). Artificial Intelligence Enabling Machines to Learn: Experts Perspectives . London: Arup.

Söderlund, J., Sankaran, S., and Biesenthal, C. (2016). Call for Papers: Special Issue on Megaprojects—Symbolic and Sublime: An Organizational Theory Perspective . Newtown Square, PA: Project Management Institute, Inc.

Sovacool, B. K., and Cooper, C. J. (2013). The Governance of Energy Megaprojects: Politics, Hubris and Energy Security . Cheltenham and Northampton, MA: Edward Elgar Publishing.

Stehr, N., and von Storch, H. (2000). Eduard Brückner—The Sources and Consequences of Climate Change and Climate Variability in Historical Times . Heidelberg: Springer.

Sterman, J. D. (1992). System Dynamics Modeling for Project Management . Cambridge, MA: Massachusetts Institute of Technology.

STI (2017a). Comprehensive Strategy on Science, Technology and Innovation for 2017 . Tokyo: Council for Science, Technology and Innovation (STI).

STI (2017b). Integrated Innovation Strategy . Tokyo: Council for Science, Technology and Innovation (STI).

Taylor, F. W. (1911). The Principles of Scientific Management . New York and London: Harper and Brothers Publishers.

The Press Office (2013). Presidential Policy Directive—Critical Infrastructure Security and Resilience . Washington, DC: The White House Office of the Press Secretary (The Press Office).

Thorpe, B., and Sumner, P. (2004). Quality Management in Construction . Aldershot: Gower Publishing, Ltd.

Tixier, A., Hallowell, M. R, Rajagopalan, B., and Bowman, D. (2016). Automated content analysis for construction safety: a natural language processing system to extract precursors and outcomes from unstructured injury reports. Automat. Construct. 62. 45–56. doi: 10.1016/j.autcon.2015.11.001

Walker, A. (2015). Project Management in Construction, 6th Ed . Chichester: John Wiley and Sons Ltd.

Walker, D. H. T. (2016). Reflecting on 10 years of focus on innovation, organisational learning and knowledge management literature in a construction project management context. Construct. Innovat. 16, 114–126. doi: 10.1108/CI-12-2015-0066

Wang, X., Chong, H.-Y., and Kwak, Y. H. (2017). Special collection announcement: supply chain management in megaprojects. J. Manag. Eng. 33:4. doi: 10.1061/(ASCE)ME.1943-5479.0000516

Wang, Z., Li, H., and Zhang, X. (2019). Construction waste recycling robot for nails and screws: computer vision technology and neural network approach. Automat. Construct. 97, 220–228. doi: 10.1016/j.autcon.2018.11.009

Waziri, B. S., Bala, K., and Bustani, S. (2017). Artificial neural networks in construction engineering and management. Int. J. Architect. Eng. Construct. 6, 50–60. doi: 10.7492/IJAEC.2017.006

Wegrich, K., Kostka, G., and Hammerschmid, G. (2017). The Governance of Infrastructure . Oxford: Oxford University Press.

Whyte, J., and Nikolić, D. (2018). Virtual Reality and the Built Environment, 2nd Ed . Abingdon: Routledge.

Winch, G. M. (2009). Managing Construction Projects, 2nd Ed . Chichester: John Wiley and Sons Ltd.

Womack, J. P., and Jones, D. T. (1996). Lean Thinking: Banish Waste and Create Wealth in Your Corporation . New York, NY: Simon and Schuster.

Wu, C., Chen, D., and Huang, S. (2018). Complexity of Construction Mega Infrastructure Project: Call for Papers . London: Hindawi Publishing Corporation.

Xu, W., and Chen, Z. (1997). Intelligent Methods in Construction . Shanghai: Tongji University Press.

Yang, J. (2017). Environmental Management in Mega Construction Projects . Singapore: Springer.

Yeung, C.L., Cheung, C.F., Wang, W.M., and Tsui, E. (2014). A knowledge extraction and representation system for narrative analysis in the construction industry. Expert Syst. Appl. 41, 5710–5722. doi: 10.1016/j.eswa.2014.03.044

Keywords: abductive reasoning, built environment, construction management, body of knowledge, digital innovation, intelligent system, megaproject management

Citation: Chen Z (2019) Grand Challenges in Construction Management. Front. Built Environ . 5:31. doi: 10.3389/fbuil.2019.00031

Received: 20 July 2018; Accepted: 25 February 2019; Published: 02 April 2019.

Reviewed by:

Copyright © 2019 Chen. This is an open-access article distributed under the terms of the Creative Commons Attribution License (CC BY) . The use, distribution or reproduction in other forums is permitted, provided the original author(s) and the copyright owner(s) are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. No use, distribution or reproduction is permitted which does not comply with these terms.

*Correspondence: Zhen Chen, [email protected]

ScholarWorks at WMU

Home > Engineering > Civil and Construction Engineering > Master's Theses

Civil and Construction Engineering Master's Theses

All master’s theses completed through the Graduate College of Western Michigan University since 2012 have been entered into ScholarWorks. Some may be embargoed or restricted by the authors and may be only available from on-campus computers. Print copies from earlier years are available through interlibrary loan. We have a few digital copies of earlier years. If you have any questions, please contact [email protected].

Theses/Dissertations from 2023 2023

Investigating Disparities and Safety Equity in Pedestrian Nighttime Crashes in Michigan , Sia Isaria Mwende

Theses/Dissertations from 2020 2020

Evaluating the Impacts of Building Information Modeling on Construction Change Orders in Iraq , Nehad Alshebbany

Numerical Performance Evaluation of the Wooden Frame Structures with Adhesive Applied Connection under Wind and Seismic Loading , Sharthak Bhandary

Theses/Dissertations from 2018 2018

Establishing Delay-Based Criteria for Installing Traffic Signals at Two-Lane Roundabouts , Oluwaseun Ayomide Adegbaju

From Architectural Design to Structural Analysis: A Data-Driven Approach to Study Building Information Modeling (BIM) Interoperability , Mohammed Aldegeily

Evaluation of Bike Boxes and Protected Intersections with Bicycle Signal Treatments for Improving Safety and Multimodal Mobility at Urban Signalized Intersections , Odai Al Houz

Enabling Robust Distributed Real-Time Hybrid Simulation Method and Expanding Its Applications in Floating Wind Turbine Systems , Mehmet Cinar

Maintaining Deck Profile in Steel I-Girder Bridges During Deck Placement , Ali Naif Inceefe

Theses/Dissertations from 2017 2017

Enhancing Intersection Safety for the Blind and Visually Impaired (BVI) Pedestrian Using Device-to-Infrastructure Communication , Mohammad Sayyah Al-Akash

Visualizing the Constructability of a Steel Structure Using Building Information Modeling and Game Simulation , Mohammed Al Dafaay

Evaluation of Swarm Nodes for Proximity Sensing on Construction Sites , Mohamed Ahmed Madi Binalhaj

Implementing Online Updating to Complex Hysteresis Models in Real- Time Hybrid Simulation Using Constrained Unscented Kalman Filter , Bilal Ahmed Mohammed

Economic Impact Analysis of Bridge Construction , Funda Yavuz

Theses/Dissertations from 2016 2016

Analysis of Pedestrian and Bicycle Crashes in Michigan , Ahmed Abbas Ghubin Al-zubaidi

Comparison of Safety and Operational Performances for Three Engineering Countermeasures , Ali Hamzah Hussein Alzuhairi

Comprehensive Evaluation of the Effectiveness of Pedestrian Countdown Signals on Road Users in Michigan , Richard Atta Boateng

Safety Benefit Analysis of Alternative Delineation Practices in Michigan , Brenda C. Burdick

Verifying Automated Prestressed Concrete Design Software for MDOT Bridge Design Standards , Hussein Kadhim Abood Khalaf

Improved Methodology for Developing Non-Motorized Safety Perfomance Functions , Keneth Morgan Kwayu

Application of Wavelet Transform in Structural Health Monitoring , Yashodhya Swarna Sri Dhanapala Liyana Kankanamge

Analysis of Transit Accessibility for People with Disabilities , Rostam Khalid Mohammed Ameen Qatra

Developing Standard Procedures for Structural Aspects of Slide-in Bridges in Accelerated Bridge Construction (ABC) , Ozan Utku Ridvanoglu

An Equivalent Plate Model with Orthotropic Material Properties for Adjacent Box-Beam Bridge Superstructure , Timothy Alexander Schnell

Transportation System and Its Association with Human Health – A Review and Modeling Approach , Fnu Zahed

Theses/Dissertations from 2015 2015

Evaluation of the Safety Effectiveness of Clearview Font and Fluorescent Yellow Sheeting on Michigan Freeways and Non-Freeways , Lusanni Mercedes Acosta Rodrieuez

Analysis of Mobility Impact for Implementing Complete Streets , Marino Esteban Calderón Díaz

A Microscopic Simulation Approach to Performance Evaluation of Intelligent Transportation System Corridors: A Case in Michigan , Matthew Levi Clark

Fragility Assessment of High-Rise Reinforced Concrete Buildings , Hezha Sadraddin

Theses/Dissertations from 2014 2014

An Integral Framework for Sustainable Building Design , Bushra Asfari

Economic Analysis of Michigan Commercial Vehicle Enforcement Strategies , Randy José Jorge Díaz

Development of Safety Performance Functions for Non-Motorized Traffic Safety , Hamidreza Ahady Dolatsara

Real-Time Hybrid Simulation with Online Model Updating , Adam Mueller

Overtime Traffic Enforcement Evaluation: A Methodology for Selecting Agencies and Enforcement Periods , Dario Enrique Romero Santana

Virtual Analysis and Evaluation of Roundabout Safety and Operational Features , Elisha Jackson Wankogere

Theses/Dissertations from 2013 2013

Spatial Factors Impacting Non-Motorized Exposures and Crash Risks , Farhad Abasahl

Standardized Longitudinal Connection Detail for Decked Precast Prestressed Concrete Girders , Ramzi Muftah Ali Abduallah

Investigating Crash Frequency and Injury Severity at Freeway Fixed Weigh Stations in Michigan , Fathi Salam Mo. Alkhatni

Safety Benefits of Adaptive Traffic Control Systems: A Case Study of Oakland County, MI , Joshua Adam Fink

Evaluation of Point Cloud Data Dispersion with Relation to Point Cloud Density under Field Conditions , Ling Kit Kong

An Automated Approach to Dynamic Site Layout Planning , Duy Huu Nguyen

Cyber-Adaptive Physical Systems for Automated Construction Progress Monitoring and Asset Tracking , Syed Hammad Rasheed

Theses/Dissertations from 2012 2012

The Implementation of a Versatile Pseudodynamic Hybrid Simulation for Seismic Evaluation of Structural Systems , Chelsea Griffith

Regression-Based Prioritization and Data Modeling for Customized Civil Engineering Data Collection , Omar Kanaan

Statistical and Numerical Integrated Approach for Detecting Onset of Prefabricated Bridge Component Connection Deterioration , Cem Mansiz

Structural Health Monitoring of a Bridge Structure Using Wireless Sensor Network , CheeKian Teng

Theses/Dissertations from 2011 2011

Sensor Modeling and Cost Benefit of Using Laser Scanning Technology in AEC , Fahd Saleh Alaswad

Statistical and Visualization Approach for Ranking Factors Affecting NBI Bridge Rating , Saad Aoun Alqahtani

Solar Modeling and Cost-Benefit Analysis of Energy Efficiency Window Arrangements , Wael Muqhim Alruqi

A Comparative Analysis of the Sense of Construction Delays of Experienced and Inexperienced Engineers , Salahedeen A. El Kadeki

Development of a Versatile Hybrid Testing System for Seismic Evaluation of Structural Systems , Griffin Enyart

Selecting an Optimal Construction Alternative through Informed Decision-Making Highway Bridges , Abdul Wahed Mohammed

Theses/Dissertations from 2010 2010

A Computer Model for Sustainable for Life-Cycle Cost Analysis , Sami Ghurmullah Al Ghamdi

Sustainable Universal Design and Zero Energy for Buildings , Ahmad Mohammad Alotaibi

Integration of Sustainability Measure into Highways , Krishna Prasad Dhakal

Investigation of Damage Detection Methods with a Wireless Sensor Network , Mark Joseph Humiecki

Application of Building Information Modeling (BIM) toward Zero Energy High Rise Office Buildings , Moutaz Mohammed Msawealfi

Design Recommendations for High Skew Link Slabs , Michael A. Romkema

Theses/Dissertations from 2009 2009

Optimization Computer Model for Heavy Equipment Selection , Naif Albelwi

Optimal Placement of Traffic Sensors for Traffic Operation and Management , Nahedh M. Alhubail

An Integrated Database Management System and Building Information Modeling for Sustainable Design , Sultan Althobaiti

The Design and Implementation of a Sensor Network System for Concrete Bridge Health Monitoring , Joseph John Barbera

Barrier-Based Evacuation Plan for University Campuses , Asadur Rahman

Highway Construction Staging and Intelligent Traffic Routing: A Cost Optimization Strategy , Richard C. Rhodes

Theses/Dissertations from 2008 2008

Incorporation of Space Syntax Theory in Determining Safe and Efficient Construction Site Layout , Minsuck Cho

Cathodic Protection of Reinforced Concrete Bridge Decks , Joshua Thomas Host

Theses/Dissertations from 2007 2007

Data Fusion Technique for Measuring Intersection Delay Using GPS-Enabled Probe Vehicles , Byung-Hee Han

Development of Knowledge Base of Concrete Bridge Maintenance System , Bahre Karam

Health Monitoring of Concrete Bridges Utilizing Sensor Technology , Ammar Zalt

Theses/Dissertations from 2006 2006

Repair, Inspection and Maintenance Methods of Steel Bridges , Deepak Koirala

Computer Model to Select Leed Certification for Building Projects , Ruba Mirghani Mohammed

Simulation Based Evaluation of Parking Facilities , Niru Tiwari

Theses/Dissertations from 2005 2005

Alkali Silica Reaction in Virgin and Recycles Aggregates: State of the Art and Experimental Investigation using ASTM C 1260 and the Staining Method , Shadi Sami Bajjali

Evaluation of Mechanical Properties of Self-Consolidating Concrete , Bhusan Basnet

Decision Support System for Bridge Maintenance , Imran Fazal

Evaluation of Mechanical Properties of Recycled Aggregate Concrete , Sajjad Ali Khan

The Detection of Common Concrete Bridge Deck Defects Using the Thermography, Impact Echo, and Ground Penetrating Radar , Saleh Z. Nabulsi

Theses/Dissertations from 2004 2004

Oxidation of Titanium in Alpha-Calf Serum Solution , Ali Stait Ismailoglu

Theses/Dissertations from 2003 2003

Mechanical Properties and Corrosion Resistance of NI-SIC NANO Composite Coatings on 2024-T3 Aluminum , Amit Jain

Development of a Redesign Plan for Moore Hall using Architectural Principles of Green Building and Sustainable Design , Alkhaziam Saad

Future Housing in the United States: Senior’s Housing Demand , Sandeep Singh

Innovative Contracting Prequalification/Selecion Model using Analytical Hierarchy Process (AHP) , Saad J. Zidan

Theses/Dissertations from 2002 2002

An Imaging System for Concrete Bridge Inspection , Mohammed Talal Al-Bataineh

A Model for Optimizing the Selection of Project Delivery Systems Using Analytic Hierarchy Process (AHP) , Arosha De Silva

Metastable Phases of Mgo-TiO 2 Solid Solutions , Liang-Chieh Ma

Building Deconstruction Guidelines: Tools for Recovering Building Materials , Ali Ayedh Merzen

Management Commitment to Construction Safety , Areen M. Shaar

Adaptation of Project Finance to Small Contractor Financing , Ragunathan Venkateswaran

Theses/Dissertations from 2001 2001

Structural Studies of Metastable Nanocrystalline Magnesium Titanate Ceramics , Renmei Xu

Theses/Dissertations from 2000 2000

Texture and Young’s Modulus of Nickel/Gamma-Alumina Composites , Abdulaziz Alamr

CFMMS – Computerized Facilities Maintenance Management System , Prawit Rotsawatsuk

Learning Reinforced Concreyte Design Principles Using a Java-VRML based Design Studio , Amarneethi Vamadevan

Theses/Dissertations from 1999 1999

Quantitative, Non-Destructive Calibration of Scanned Probe Microscope Cantilevers , John Hazel

Development of Mechanical Properties Micromapping for Composite Polymer Systems , Zheng Huang

Intellicrances – A Neural Network-Based Crane Selection System , André T. Mund

Conform- A Computerized Job-Built Concrete Construction Formwork Design , Kajpong Pongponrat

ScholarWorks

Advanced Search

  • Notify me via email or RSS
  • Collections
  • Disciplines

Author Corner

  • Civil and Construction Engineering

Western Michigan University Libraries, Kalamazoo MI 49008-5353 USA | (269) 387-5611

Home | About | FAQ | My Account | Accessibility Statement

Privacy | Copyright

Online Thesis - FKA

Construction Management

*NOTE: listed below are theses with pdf link. To see the full list of PhD theses in FKA, click here updated on 15/03/2018

2004    2005   2006   2007   2008    2009     2010     2011    2012    2013     2014    2015    2016     2017    2018

Nor A’ini Binti Rajab (2017)

Nor A’ini Binti Rajab (2017)

Kerangka Gaya Hidup Dan Keutamaan Perumhan Golongan Berpendapatan Menengah (PDF Link)

Mahdi Moharrami Meynagh (2017)

Mahdi Moharrami Meynagh (2017)

Collaborative Procurement Strategy In Private Sector Housing Project Using Industrialised building System (PDF Link)

Lai Woon Fatt (2017)

Lai Woon Fatt (2017)

Conceptual Model Of Engineering Consultancy Practice (ECP) Performance Measurement Factors In Malaysia (PDF Link)

Amir Mahdiyar (2017)

Amir Mahdiyar (2017)

A Decision Support System For The Selection Of Green Roof For Residential Buildings (PDF Link)

Ali Asghar Bavafa (2017)

Ali Asghar Bavafa (2017)

Developing A Generic Safety Performance Evaluation Prototype For Construction Projects In Malaysia (PDF Link)

Farahbod Mohammadi (2016)

Farahbod Mohammadi (2016)

A Decision Support System for Demolition Safety Risk Assessment (pdf link)

Ferry Firmawan (2016)

Ferry Firmawan (2016)

The Development Of Green Construction Site Index Ferry (pdf)

Hadi Sarvari (2016)

Hadi Sarvari (2016)

A Hybrid Multi-Criteria Decision Making Method For Risk Assessment Of Public-Private Partnership Projects (pdf)

Mohammad Abedi (2016)

Mohammad Abedi (2016)

Context-Aware Collaboration Tool For Precast Supply Chain Management (pdf)

Ramzi Bin Ibrahim (2014)

Ramzi Bin Ibrahim (2014)

Information Sharing Platform To Support Collaborative Teamwork In Construction (pdf link)

Ali Tighnavard Balasbaneh (2014)

Ali Tighnavard Balasbaneh (2014)

Residential Housing Building Scheme For Global Warming Mitigation (pdf link)

Wan Zahran Zakaria (2013)

Wan Zahran Zakaria (2013)

Executive Information System for Monitoring Building Construction Work Progress (pdf link)

Mohammadreza Yadollah (2013)

Mohammadreza Yadollah (2013)

Budget Allocation Management Model for Seismic Rehabilitation of Infrastructure Assets (pdf link)

Vikneswaran A/L Munikanan (2011)

Vikneswaran A/L Munikanan (2011)

Sustainable Neighbourhood Elements For Urban Neighbourhood Planning And Design (pdf link)

Siti Rashidah Bt Mohd Nasir (2011)

Siti Rashidah Bt Mohd Nasir (2011)

Contractor Performance Measurement For Public School Projects (pdf link)

Chong Heap Yih (2010)

Chong Heap Yih (2010)

E-Dispute Resolution Model On Contractual Variations (pdf link)

Syuhaida Ismail (2009)

Syuhaida Ismail (2009)

Key Performance Indicators For Private Finance Initiative In Malaysia(pdf link)

Rosli Mohamad Zin (2004)

Rosli Mohamad Zin (2004)

Design Phase Constructability Assessment Model (pdf link)

Home » Blog » Dissertation » Topics » Construction » Construction Management » 80 Construction Management Research Topics

Dissertation Help Logo

80 Construction Management Research Topics

FacebookXEmailWhatsAppRedditPinterestLinkedInAre you a student searching for captivating research topics in the field of construction management? Look no further. Our extensive list of dissertation topics is designed to help you find compelling and engaging ideas for your academic work. Whether you’re pursuing a degree at the undergraduate, master’s, or doctoral level, our comprehensive collection of topics […]

construction management research topics

Are you a student searching for captivating research topics in the field of construction management? Look no further. Our extensive list of dissertation topics is designed to help you find compelling and engaging ideas for your academic work. Whether you’re pursuing a degree at the undergraduate, master’s, or doctoral level, our comprehensive collection of topics will provide you with the inspiration you need to embark on your research journey.

As the construction industry continues to evolve and face new challenges, conducting research in this field becomes increasingly important. Whether you are an undergraduate, master’s, or doctoral student, exploring research topics in construction management provides an opportunity to delve into emerging trends, address industry challenges, and contribute to the advancement of this dynamic field. From project management and sustainable construction to risk assessment and digital technologies, our comprehensive list of research topics offers a wide range of options to suit your interests and academic level. These topics provide a solid foundation for conducting in-depth research, making valuable contributions to the construction industry, and establishing yourself as an expert in this ever-changing field.

A List Of Potential Research Topics In Construction Management:

  • Analyzing the Role of Digital Technologies (E.g., Drones, Robotics) in Improving Construction Productivity in the UK.
  • Investigating the Use of Building Life Cycle Assessment in Sustainable Construction.
  • Investigating the Role of Social Responsibility in Construction Project Stakeholder Management.
  • Analyzing the Influence of Building Design on Construction Site Safety.
  • Assessing the Influence of Project Procurement Methods on Construction Project Outcomes.
  • Investigating the Impact of Construction Site Layout on Project Execution.
  • Exploring Strategies for Effective Construction Project Scheduling and Time Management.
  • Investigating the Use of Building Performance Simulation in Design Optimization.
  • Assessing the Use of Sustainable Construction Materials in Infrastructure Projects.
  • How Has the Covid-19 Crisis Affected the Regulatory Landscape and Compliance Requirements in the Construction Industry?
  • The Impact of Sustainability Practices on Construction Project Performance.
  • Evaluating the Effectiveness of Public-private Partnerships (Ppps) in Delivering Major Infrastructure Projects in the UK.
  • Assessing the Implementation of Green Building Practices in the Construction Industry.
  • Investigating the Use of Artificial Intelligence (Ai) in Construction Project Management.
  • Examining the Impact of Prefabrication and Modular Construction on Project Efficiency.
  • The Role of Building Performance Monitoring in Post-occupancy Evaluation.
  • How Has the Covid-19 Pandemic Influenced the Design and Layout of Construction Sites to Ensure Social Distancing and Safety Measures?
  • Exploring Strategies for Enhancing Construction Project Communication and Coordination.
  • Exploring Strategies for Effective Supply Chain Management in Construction Projects.
  • Assessing the Impact of the Construction (Design and Management) Regulations (CDM) on Health and Safety in the UK Construction Industry.
  • What Are the Lessons Learned From the Covid-19 Crisis in Terms of Risk Management and Contingency Planning in Construction Projects?
  • Exploring Strategies for Effective Conflict Resolution in Construction Projects.
  • Evaluating the Role of Building Information Modeling (BIM) in Construction Management.
  • Assessing the Influence of Client’s Requirements and Expectations on Project Success.
  • Investigating the Use of Drones in Construction Site Monitoring and Inspection.
  • Assessing the Effectiveness of Risk Management Strategies in Construction Projects.
  • Investigating the Role of Building Performance Evaluation in Ensuring Occupant Satisfaction.
  • How Has the Pandemic Accelerated the Adoption of Off-site and Modular Construction Methods in the Industry?
  • Exploring Strategies for Effective Risk Assessment and Mitigation in Construction Projects.
  • The Role of Sustainable Procurement in Construction Supply Chain Management.
  • Examining the Impact of Brexit on the Construction Industry in the UK: Challenges and Opportunities.
  • Assessing the Impact of Building Information Modeling (Bim) on Facility Management.
  • Exploring the Integration of the Internet of Things (IoT) in Smart Construction Sites.
  • Exploring Strategies for Effective Construction Cost Estimation and Control.
  • What Are the Challenges and Opportunities for Sustainable Construction Practices in the Post-covid Era?
  • Analyzing the Influence of Project Delivery Methods on Construction Project Performance.
  • Exploring Strategies for Effective Construction Claims Management and Dispute Resolution
  • How Has the Covid-19 Crisis Influenced the Implementation of Health and Safety Protocols in Construction Sites?
  • Exploring Strategies for Enhancing Productivity and Efficiency in Construction Workforce.
  • Investigating the Role of Ethical Considerations in Supply Chain Management Within the UK Construction Sector.
  • What Are the Implications of the Pandemic on the Financial Viability and Profitability of Construction Projects and Companies?
  • Exploring Strategies for Achieving Carbon Neutrality in UK Construction Projects: a Case Study Analysis.
  • Investigating the Impact of Information Sharing and Collaboration in Construction Supply Chains.
  • Assessing the Role of Project Management Software in Construction Project Planning and Execution.
  • Investigating the Impact of Environmental Regulations on Construction Project Sustainability.
  • How Has the Pandemic Reshaped Client Requirements and Expectations in Construction Project Delivery?
  • Investigating the Impact of Sustainable Building Certifications (E.g., BREEAM, LEED) on UK Construction Projects.
  • How Has the Pandemic Influenced the Perception and Adoption of Resilience Planning in Construction Project Management?
  • What Are the Long-term Implications of the Covid-19 Pandemic on Construction Project Budgets and Cost Management?
  • Assessing the Adoption of Circular Economy Principles in Construction Industry.
  • Evaluating the Influence of Cultural Factors on Project Management Practices in Multinational Construction Projects in the UK.
  • Analyzing the Use of Robotics and Automation in Construction Site Operations.
  • The Role of Performance Measurement and Key Performance Indicators (Kpis) in Construction Management.
  • Analyzing the Influence of Cultural Factors on International Construction Projects.
  • Investigating the Use of Virtual Reality (Vr) in Construction Planning and Design.
  • Investigating the Use of Building Information Modeling (Bim) in UK Construction Projects: a Case Study.
  • Exploring the Adoption of Lean Construction Techniques in the Construction Industry.
  • Analyzing the Role of Stakeholder Engagement and Social Responsibility in Sustainable Construction Projects in the UK.
  • Analyzing the Impact of Building Renovation and Retrofitting on Energy Efficiency.
  • What Are the Key Strategies for Managing Supply Chain Disruptions in the Construction Industry Post-covid?
  • Analyzing the Impact of Technology Adoption on Construction Project Innovation.
  • Investigating the Strategies for Managing Construction Project Risks in the UK: a Case Study Approach.
  • What Are the Strategies to Mitigate the Impact of Future Disruptions on Construction Project Schedules and Timelines Post-covid?
  • Assessing the Implementation of Off-site Construction Techniques in Addressing Housing Shortages in the UK.
  • Analyzing the Influence of Leadership Styles on Construction Team Performance.
  • Assessing the Role of Government Policies and Regulations in Promoting Sustainable Construction Practices in the UK.
  • Assessing the Role of Value Engineering in Construction Project Cost Optimization.
  • Assessing the Impact of Building Codes and Regulations on Construction Project Sustainability.
  • The Role of Quality Management Systems in Construction Project Delivery.
  • How Has the Pandemic Affected the Productivity and Efficiency of Construction Workforce and What Are the Strategies to Address It?
  • Analyzing the Benefits and Challenges of Implementing Sustainable Materials in Construction.
  • How Has the Covid-19 Pandemic Impacted the Adoption of Digital Technologies in Construction Project Management?
  • The Role of Stakeholder Engagement in Successful Construction Project Delivery.
  • Assessing the Role of Building Regulations in Ensuring Quality and Safety in Construction.
  • Exploring Strategies for Enhancing Occupational Health and Safety in Construction.
  • Analyzing the Impact of the Covid-19 Pandemic on the UK Construction Sector: Lessons Learned and Future Strategies.
  • The Impact of Covid-19 on Construction Project Planning and Management.
  • What Are the Emerging Trends in Remote Project Management and Virtual Collaboration in the Construction Sector Post-covid?
  • Exploring the Role of Collaborative Procurement Methods in Enhancing Project Outcomes in UK Construction.
  • Investigating the Use of Sustainable Energy Technologies in Construction Projects.

In conclusion, if you are a student at the undergraduate, master’s, or doctoral level seeking compelling research topics in the field of construction management, our comprehensive list provides a wealth of possibilities for your dissertation research. From exploring the impact of technological advancements and sustainability practices to analyzing project management strategies and regulatory frameworks, these topics cover a wide range of areas within the construction management discipline. By selecting a topic that aligns with your interests and career aspirations, you can delve into in-depth research, contribute to the advancement of the field, and make a meaningful impact.

Order Construction Management Dissertation Now!

External Links:

  • Download construction management dissertation sample for your perusal

Research Topic Help Service

Get unique research topics exactly as per your requirements. We will send you a mini proposal on the chosen topic which includes;

  • Research Statement
  • Research Questions
  • Key Literature Highlights
  • Proposed Methodology
  • View a Sample of Service

Ensure Your Good Grades With Our Writing Help

  • Talk to the assigned writer before payment
  • Get topic if you don't have one
  • Multiple draft submissions to have supervisor's feedback
  • Free revisions
  • Complete privacy
  • Plagiarism Free work
  • Guaranteed 2:1 (With help of your supervisor's feedback)
  • 2 Installments plan
  • Special discounts

Other Posts

  • 80 Building Surveying Research Topics June 11, 2023 -->
  • 80 Quantity Surveying Research Topics June 10, 2023 -->

WhatsApp us

55 Construction Management Topics & Essay Examples

Looking for interesting construction management topics? Look no further! This list contains writing ideas related to all things construction industry: building materials, newest technology, and more. With our construction management research topics, you’re sure to get an A+!

🏆 Best Construction Management Topic Ideas & Essay Examples

✅ interesting topics to write about construction management, 🔍 good essay topics on construction management.

  • Villa Construction Project Management The project I have chosen is the construction of a villa. The aim of the project is to construct a villa and have it ready for use within three months.
  • House Construction Project Management The construction project is the basis of project scheduling and cost control. The project will increase the product portfolio of the company.
  • Evolution of Construction Management From 1960s to Today Thus, the basic features of management within the scope of construction were visible already throughout the undertakings of the first people.
  • The UK Construction Industry’s Risk Management The construction industry is a major generator of waste, and accounts for 50% of the waste deposited in a typical landfill.
  • Procurement Opportunities in Construction Management The choice between the four types of procurement available in the construction industry leads to a sharp rise in the quality of the result.
  • Exposition for the Application to Master in Construction and Real Estate Management at HTW Berlin Countries around the world have realized that the best way of managing the competitiveness of the market is to successfully government and private projects completed in time and as per the expectations.
  • Software Tools in Construction: Design and Management of Projects Application of software is relevant in simulation and visualization of project scope, schemes projection, and monitoring of changes in plan in terms of cost and design.
  • JP Phentar: Construction Project Management Tools Due to the unique nature of the project, there is a need for the establishment of an effective managerial framework. One of the most crucial aspects of the construction project is the quality of work.
  • Robotics in Construction Management: Impacts and Barriers The assessment of the economic feasibility of the robotization of individual construction processes is based on cost analysis and the calculation of payback.
  • SWOT and Construction Management In another study that concentrated on the Azzaro Construction Project, contractors were asked to detail the relevance SWOT had on the effectiveness of the project. In the study of the Azzaro construction project, the contractors […]
  • Integrating Building Information Management (BIM) Into Construction Supply Chain Management The events are part of the whole production process, starting with the inception of the facility and all materials involved, to the end users and products delivered at the last phase.
  • Construction Project Management Strategic Issues The task of the project managers is to oversee the activities of the project until its completion. The money would be used to purchase equipment that would be used in the whole project and pay […]
  • Caspian Construction PLC: Security Management It will be the duty of the contracted local firm to carry out all the duties concerning the provision of security within the site.
  • The U.S. Housing Construction Sector Risks Management The probability of the occurrence of the risk measures the degree of certainty within which the risk may occur. The consequences associated with the risk describe the seriousness of the effects of the occurrence of […]
  • Rules of Negotiation in Construction Contract Management When the term negotiation is mentioned various aspect comes into play such as the venue, when or the time for negotiation, aggression in the push of the agenda, the role played among many other issues. […]
  • Improving the Construction Management Process
  • Construction Business and Law: Construction Management
  • Linking Construction Management and Construction Project Management
  • Construction Industry: The Integrated Project Delivery (IPD) System
  • Overview of Contemporary Construction Management Changes
  • Construction Management and Economics: New Directions
  • Unresolved Conflict Between Two Construction Management Paradigms for Contingency Project Environments
  • Construction Management and Economics: The Epistemology of a Multidisciplinary Design Science
  • Improving Higher Education for Construction Management
  • Construction Management and Property for Environmental Analysis
  • Powerful Construction Management Software Solutions
  • Project and Construction Management Guidelines
  • Correlation Between Quantity Surveying and Construction Management
  • Sustainable Construction Management: Introduction of the Operational Context Space
  • Systems Principles for Construction Management
  • Tacit and Explicit Knowledge in Construction Management
  • The Baby and the Bathwater: Research Methods in Construction Management
  • Overview of the Contract Construction Management Law
  • Thinking About Materiality: Value of a Construction Management and Engineering View
  • Total Quality Management and the Learning Organization: Dialogue for Change in Construction
  • Linking Construction Project Management and Business Management
  • Applying the Project Management in the Construction Industry
  • Importance of Risk Management in Construction
  • Project Management Issues in Construction Sites Environment
  • Importance of Facility Management in the Construction Industry
  • Construction Management Safety Program: Safe Driving
  • Importance of Quality Management in the Construction Industry
  • Overview of the Importance of Construction Management
  • Precautionary Construction Management for Sustainability
  • Elements of Cost Overruns, Delays, and Risk Involved in Construction Management
  • Construction Management With Focus on Life-Time Health
  • Application of Automation for Construction Management
  • Construction Management and Process Design Around Construction Robots on the Construction Site
  • Risk Management as the Key in Construction Management
  • Roles of BIM in Construction Management
  • Use of Building Information Model to Improve Construction Management in the UK
  • Is Construction Management Education Irrelevant?
  • The Effect of Socio-Economic Cultures on Local Construction Management
  • The Role of Social Media in Construction Management
  • Construction Management: Common Issues in Construction Projects
  • Chicago (A-D)
  • Chicago (N-B)

IvyPanda. (2023, November 9). 55 Construction Management Topics & Essay Examples. https://ivypanda.com/essays/topic/construction-management-essay-topics/

"55 Construction Management Topics & Essay Examples." IvyPanda , 9 Nov. 2023, ivypanda.com/essays/topic/construction-management-essay-topics/.

IvyPanda . (2023) '55 Construction Management Topics & Essay Examples'. 9 November.

IvyPanda . 2023. "55 Construction Management Topics & Essay Examples." November 9, 2023. https://ivypanda.com/essays/topic/construction-management-essay-topics/.

1. IvyPanda . "55 Construction Management Topics & Essay Examples." November 9, 2023. https://ivypanda.com/essays/topic/construction-management-essay-topics/.

Bibliography

IvyPanda . "55 Construction Management Topics & Essay Examples." November 9, 2023. https://ivypanda.com/essays/topic/construction-management-essay-topics/.

  • Earthquake Essay Topics
  • Fire Safety Ideas
  • Urban Planning Research Ideas
  • Research and Development Essay Topics
  • Dispute Resolution Questions
  • Competitive Strategy Research Ideas
  • Home Depot Titles
  • Agile Project Management Research Topics

Digital Commons at Harrisburg University

Home > PMGT > Dissertations and Theses

Project Management, Graduate (PMGT)

Dissertations and Theses

Theses/dissertations from 2020 2020.

Challenges to Adopting Hybrid Methodology: Addressing Organizational Culture and Change Control Problems in Enterprise IT Infrastructure Projects , Harishankar Krishnakumar

The Difficulty With Introducing Project Management Techniques in Digital Startups , Isabela Mantilla

Theses/Dissertations from 2018 2018

Reasons for Success and Failure of Projects , Tamunogbenye Dago

Impediments in Transitioning to Agile Time-boxing Testing Efforts , Taniya Dasgupta

Implementing Agile Methodology Techniques in Automobile Industry , Nikhil Kranthi Datrika

The Role of Project Management in Fostering Creativity: Towards Successful Architectural Design Projects , Angeliki Giannoulatou Destouni

Implementing Project Management Principles in Digital Advertising Age , Yuanqing Jiang

BIM and Project Management in AEC Industry , Nazanin Kamyab

IMPACT OF MOTIVATION ON PROJECT TEAMS’ PERFORMANCE IN INFORMATION TECHNOLOGY , RAMU KARANAM

Adopt Agile Methodology for Building Wealth Management Platform Building , Mandar Shripad Kulkarn

STUDY ON RECOVERY OF BAD SOCIAL MEDIA REVIEWS IN THE HOSPITALITY INDUSTRY USING PROJECT MANAGEMENT PRINCIPLES , FRANCK LEGRAND

AGILE ADOPTION IN INVESTMENT BANKS , JIAYIN LIANG and Suman Shekhar

SCRUM IN CONSTRUCTION INDUSTRY TO IMPROVE PROJECT PERFORMANCE IN DESIGN PHASE , YINGCHEN LIU

IMPROVING SOFTWARE PROJECTS WITH CLOUD COMPUTING , SUNIL MADDIPATLA

BUSINESS PERSPECTIVE E-BANKING SYSTEMS IN INDIA , DIVYA NALLURI

Applying the Agile Mechanism in the Clinical Trails Domain for Drug Development , Jitendrakumar Narola

IMPLEMENTING AGILE LEAN IN TELECOM INDUSTRY , SWAPNIL NARVEKAR

Internet of Things (IoT) and Changing Face of Project Management , Vikram Singh Prasher

Risk Management in Telemedicine Projects in Healthcare , Shalini Sakinala

Study of the impact of team morale on construction project performance , Adrian Gerard Saldanha

Key Competencies for Project Managers: An Empirical Study , Sahil Sandhu

IDENTIFICATION OF RIGHT LEADERSHIP STYLE FOR AGILE TEAMS , AASHIK SEKHARAN

ROLE OF EFFECTIVE QUALITY RISK MANAGEMENT IN DRUG SAFETY PROJECT , Bhawna Sharma

SOFT SKILLS INFLUENCE IN PROJECT MANAGERS IN THE CLOUD SPACE , KATHERINE SILVA

Managing Business Process Transformation Projects Using Contextual Hybrid Agile Methodology , John Tu

Using IOP as a mechanism for project team management , Maryam Selah Varzi

RELATIONSHIP BETWEEN LEADERSHIP STYLES AND JOB SATISFACTION IN LUXURY RETAIL PROJECT , CUIPING ZHANG

Theses/Dissertations from 2017 2017

Applying Agile Lean to Global Software Development , Piyansh Gupta

Agile in Construction Projects , Chen Jin

Role of Agile Methods in Global Software Development , Dinesh Chandra Kalluri

Innovation through Agile Project Management , Raju Kona

The Use of Effective Risk Management in Cloud Computing Projects , Usha Kiran Marichetty

Feasibility in Applying Agile Project Management Methodologies To Building Design and Construction Industry , Roy S. Moriel

Pharmacovigilance: The Role Of Pharmaceutical Companies To Protect Patients From Adverse Drug Reactions , Srikanth Nukala

Team Performance and Project Success , Ijeoma Okoronkwo

Key to Success of Offshore Outsourcing , Deep Patel

Implementation of Agile Methodology in Public Sector , Kajal Patel

Project Manager’s Perception of Agile Methods Success , Ankit Sachdeva

Adapting Agile in Regulated (Pharmaceutical) Environment , Prachiben K. Shah

The Implication of Agile & Traditional Method as a Practice in Pharmaceutical Industry , Vishant Shah

Project Management for E-Commerce Businesses , Jui Tamhane

Critical Risk Assessment and Management in Pharmaceutical Industry , Abida Zameer

Theses/Dissertations from 2016 2016

Improved Sprint Results with Offshore Indian Teams , Fnu Abdul Hasheem

A Different Approach to Project Management: The Use of Soft Skills , Hannah Adams

ERP Critical Success Factors: Importance of ERP Consultants in ERP Implementation , Adekunle S. Balogun

Scrum Sim - A Simulation Game to Learn the Scrum Agile Framework , Anshuman Bassi

Hybrid Project Management Approach for Software Modernization , Chintan Bhavsar

Adopting Agile Scrum , Anirudh Chaganti

Supply Chain Risks: Causes & Mitigation Strategy for the Medical Device Companies , Dipak Patil

Research Paper on Content Management Systems (CMS): Problems in the Traditional Model and Advantages of CMS in Managing Corporate Websites , Elanchezhian Ramalingam

Challenges When Using Scrum in Globally Distributed Teams , Sweta Shah

A Case Study on PPL's Journey to Agile Transition , Jayalakshmi Tenali

To Overcome Communication Challenges in Distributed/Virtual Scrum Teams , Priyamvada Walimbe

Hybrid Agile Approach: Efficiently Blending Traditional and Agile Methodologies , Rashmi Wankhede

  • Collections
  • Disciplines

Advanced Search

  • Notify me via email or RSS

Author Corner

  • Submission Guidelines and Policies

Home | About | FAQ | My Account | Accessibility Statement

Privacy Copyright

IMAGES

  1. Construction Management Thesis Abstract

    construction management thesis sample

  2. Construction Management

    construction management thesis sample

  3. Strategy Management in Construction Management

    construction management thesis sample

  4. Thesis Ideas For Construction Management

    construction management thesis sample

  5. Construction management thesis subjects

    construction management thesis sample

  6. 150 Impressive Architecture Thesis Topics to Focus On

    construction management thesis sample

VIDEO

  1. MBS Thesis

  2. Management Thesis Preview

  3. MBS Thesis

  4. Thesis Work || Fully stressed out!

  5. How to write Management Thesis by Dr Ashok Kumar Katta

  6. How to Open Excel File in MS Project

COMMENTS

  1. INCREASING PRODUCTIVITY IN THE CONSTRUCTION MANAGEMENT DEVELOPMENT A Thesis

    construction management, and diversity in respondents. The construction management industry is a male dominated field which resulted in a majority of respondents being male, women in management in other industries responded differently to surveys than their male counterparts,offering a different perspective (NAWIC 2015). Limitations to

  2. Scheduling Strategies for Construction Project Managers Toward On Time

    Participants agreed that a timeline is important to completing the project on time; however, the issue is budget verses time and quality. Theme 3: Cost. The budget and cost objective theme relates to the central. research question by confirming that the project manager and owner have an objective or.

  3. Agile in Construction Projects

    Construction-is defined as the process of constructing an infrastructure or building. Agile-is a project management methodology, whereby, major tasks are subdivided into smaller. tasks supposed to be completed in phases. Project management-is usually the field of planning, initiating, controlling, executing as well as.

  4. PDF PERFORMANCE MANAGEMENT IN CONSTRUCTION PROJECTS Master thesis

    PERFORMANCE MANAGEMENT IN CONSTRUCTION PROJECTS Master thesis International Master of Science in Construction and Real Estate Management Joint Study Programme of Metropolia UAS and HTW Berlin Submitted on 20.07.2018 FARHAN AHMED Registration number: s0557514 First Supervisor: Pro.Dr.-Ing. Dieter Bunte .

  5. PDF Risk Management Practices in a Construction Project a case study

    Department of Civil and Environmental Engineering Division of Construction Management. Chalmers University of Technology SE-412 96 Göteborg Sweden Telephone: + 46 (0)31-772 1000. Sweden 2011. Risk Management Practices in a Construction Project - a case study. Master of Science Thesis in the Master's Programme.

  6. Theses and Dissertations

    The urgency to repair and reconstruct these road networks after disasters creates a sudden demand shock for construction industry services and labor. The term demand shock is used throughout this thesis to indicate changes in the demand for labor due to exogenous factors like weather-related disasters.

  7. PDF Project Management for Construction Projects

    Construction projects consists of processes, a process consists of series of actions and tasks which leads to certain goals, a process is performed by people derived by resources and supported by a flexible top management, that supports the result of all of that together will lead to project success (45). 97.

  8. [PDF] Construction Management Dissertation Sample

    Engineering. 2008. TLDR. The benefits and possible risks of BIM and future challenges for the construction industry are discussed and a case study of Hilton Aquarium project in Atlanta is presented to quantitatively illustrate the cost and time savings realized by developing and using a building information model. Expand. 216. Highly Influential.

  9. PDF Construction Management in practice

    This master thesis is the final part of the authors' education at Chalmers University of Technology in Göteborg. It is also our master thesis for a degree from the master pro-gram Design and Construction Project Management. The thesis presented is based on a literature study concerning Construction Management (CM) as a project delivery

  10. Frontiers

    The launch of the specialty section on construction management at the Frontiers in Built Environment opens a new platform for academics and practitioners in this subject field around the world to share valuable experiences and findings from innovative research and development in relation to the management of people/workforce, product/production, and processes across stages for making ...

  11. What is a good research topic for construction management thesis?

    1. Precautionary Construction Management for Sustainability, 2. Applicability of Green Engineering Solution; 3. Green Technology application in construction, 4. Green Tech Knowledge of ...

  12. Construction Project Management

    All examples on the repository received a mark of 2:1 or above. Examples are available from a number of subject areas, including Business and Management, Dental Technology and Health and Social Care. We welcome further submissions from academic staff. Please contact your Academic Librarian if you would like to add dissertations to the repository.

  13. Civil and Construction Engineering Master's Theses

    Optimal Placement of Traffic Sensors for Traffic Operation and Management, Nahedh M. Alhubail. PDF. An Integrated Database Management System and Building Information Modeling for Sustainable Design, Sultan Althobaiti. PDF. The Design and Implementation of a Sensor Network System for Concrete Bridge Health Monitoring, Joseph John Barbera. PDF

  14. (PDF) The implementation of BIM in construction projects

    The implementation of BIM in construct ion projects. Sergey S inenko1, *. , Pavel Hanitsch 1, Sheroz Aliev 1, and Mikhail Volovik 1. 1 Moscow State University of Civil Engineering, 129337, 26 ...

  15. PDF Kwame Nkrumah University of Science and Technology, Kumasi, Ghana

    PROMOTING SUSTAINABLE CONSTRUCTION PROJECT FINANCING IN GHANA: CRITICAL DRIVERS, BARRIERS AND PROPOSED STRATEGIES BY ANTHONY JAMES OPPON A Thesis submitted to the Department of Construction Technology and Management, College of Art and Built Environment in partial fulfilment of the requirements for the degree of MASTER OF PHILOSOPHY NOVEMBER, 2019

  16. Construction Management

    Rosli Mohamad Zin (2004) Design Phase Constructability Assessment Model (pdf link) PhD Theses Construction Management *NOTE: listed below are theses with pdf link. To see the full list of PhD theses in FKA, click hereupdated on 15/03/2018 ...

  17. Theory and practice of project management in construction

    The paper discusses the theory and practice of project management in construction, with particular reference to the importance of taking a systems approach. An ability to find, analyse and delimit the structure and attributes of physical systems, subsystems and components on various levels and in several hierarchies is essential for a project ...

  18. A Research Review on Building Information Modeling in Construction―An

    construction ICT topics other than BIM and 3DM (e.g., EDI or mobile technologies) left a total sample of 264 . ... Construction Management & Economics (Taylor & Francis Group) 5 . 12.

  19. Construction Dissertations

    Dissertations on Construction. Construction regards processes involved in delivering buildings, infrastructure and industrial facilities and associated activities including planning, designing, building, and fit out. Construction also covers repairs, maintenance, and demolition. View All Dissertation Examples.

  20. 80 Construction Management Research Topics

    Our extensive list of research topics in construction management will help you find compelling and engaging ideas for your dissertation. 44-20-8133-2020. ... Download construction management dissertation sample for your perusal; Research Topic Help Service. Undergrad: £30. Masters: £45.

  21. 55 Construction Management Topics & Essay Examples

    This list contains writing ideas related to all things construction industry: building materials, newest technology, and more. With our construction management research topics, you're sure to get an A+! We will write. a custom essay specifically for you by our professional experts. 808 writers online. Learn More.

  22. Construction Management Dissertation Sample 2

    Constr uction Management Disser tation Sample. newessays.co. University Logo. BIM adoption in UK PPP construction projects. A (dissertation/project) submitted in partial fulfilment of the requirements for the award of (title of degree)

  23. Project Management (PMGT) Dissertations and Theses

    Project Management for E-Commerce Businesses, Jui Tamhane. PDF. Critical Risk Assessment and Management in Pharmaceutical Industry, Abida Zameer. Theses/Dissertations from 2016 PDF. Improved Sprint Results with Offshore Indian Teams, Fnu Abdul Hasheem. PDF. A Different Approach to Project Management: The Use of Soft Skills, Hannah Adams. PDF